Carrollton · Ordenanza de zonificación
Appendix B - ZONING (RESERVED) / Article 3 - PROTECTION OF NATURAL, ENVIRONMENTAL AND HISTORIC RESOURCES
3.03.04. Administration and Enforcement
Sobre este texto
- As published by Municode, current through 2025-11-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
tent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia" published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board. The Board of Natural Resources.
Buffer. The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified Personnel. A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission. The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC. Certified Professional in Erosion and Sediment Control with current certification by Certified Profession in Erosion and Sediment Control Inc., a corporation registered in North Carolina, which is also referred to as CPESC or CPESC, Inc.
Cut. A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
Department. The Georgia Department of Natural Resources (DNR).
Design Professional. A professional licensed by the State of Georgia in the field of:
engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by Certified Professional in Erosion and Sediment Control Inc.
Director. The Director of the Environmental Protection Division or an authorized representative.
District. The West Georgia Soil and Water Conservation District.
Division. The Environmental Protection Division (EPD) of the Department of Natural Resources.
Drainage Structure. A device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm water management, drainage control, or flood control purposes.
Erosion. The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, Sedimentation and Pollution Control Plan.A plan required by the Erosion and Sedimentation Act, O.C.G.A. ch. 12-7, that includes, as minimum protections at least as stringent as the State General Permit, best management practices and the requirements in section 3.04.04 of this ordinance.
Fill. A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final Stabilization. All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal,
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.