Cartersville · Ordenanza de zonificación

Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article V - WATER SPECIFICATIONS

Sec. 7.5-122. Submittal requirements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) Water flow test.

(a) A water flow test must be performed on the existing water line to determine the adequacy of the water supply line for the project.

(b) The test shall consist of a fire hydrant flow test, conducted at the nearest hydrant to the proposed development.

(c) Test information shall consist of:

1. Static pressure and residual pressure.

2. Flow in GPM at residual pressure.

(d) An adequate supply of water for the proposed project must be available prior to the approval of any plans. Flow tests are valid for one year.

(e) The City will perform the test at the

(f) The developer will be responsible for retaining the services of an outside

consultant/contractor to accomplish and submit a design study based on the flow test results and indicating the projected available flow at the higher point in the development in GPM with residual pressure of twenty (20) psi for the total project. This report should provide results indicating adequacy of flow quantities

and pressure for the proposed development.

(2) Plans for proposed water system.

(a) Preliminary review: Preliminary plans will be prepared and submitted for review as described elsewhere in the development regulations. Questions relating to adequate fire protection, multiple feeds, water supply and proposed location of

connection(s) should be resolved at this stage before proceeding with detailed

planning. It submittal for preliminary review must include all land to be developed although the land may be developed in several phases or units.

Adequacy determinations of the existing water system will be made for the total project.

(b) Construction plans shall consist of the following:

1. Site plan with streets, street names, topography with contour lines at

two (2) foot intervals, location map, lot layout (if subdivision) or building location (if multi-family, commercial or industrial), proposed location of future sidewalks, land

Jots, district, and north arrow showing the water layout only.

2. Proposed pipe size and service lateral locations.

3. Location and size of gate valves and air release valves.

4. Thrust blocks at all bends, trees, and plugs.

5. Fire hydrant locations.

6. Water system materials.

7. Location and sizes for existing water mains surrounding the project, with

nearest line valve in each direction of proposed tie-in.

8. Detail of connection to existing lines.

9. Proposed meter sizes and locations.

10. Residential developments shall have the electric transformer locations indicated, (this is necessary to verify no conflicts exist with water meter and fire hydrant locations).

11. Plan of fire line meters or detector meters, if applicable.

12. Any proposed off-site cross-country water mains or mains on existing right-of-way should be shown at a scale no smaller than 1:100.

13. Any other items incidental to the proposed system.

14. All plans must display the "Utilities Protection Center" logo and "Call

Before You Dig" notice.

15. See section 100 check lists for additional plan requirements. The approved water plan shall not be changed except by written approval of the City or its designated representative.

(c) As-builts:

1. As-built drawings will be same format as the original construction plans.

2. Design professional shall submit asbuilt drawings to the City in PDF and AutoCAD DWG format.

3. Road names and lot numbers should be on plans.

4. "As-builts" or "record drawing" is to be stamped in large clear print on

plans.

5. Sheet should be no larger than twenty-four (24) inches x thirty-six

(36) inches.

6. Water mains and meters should be shown, including size and types.

7. Service and meter locations should be shown.

8. Include detail drawings showing size, type, configuration, and location of

fittings.

9. Include detail drawings depicting the configuration of crossings with other utilities (i.e., storm sewers, catch basins, underground cables) and indicating vertical and horizontal clearances.

10. Clearly indicate easement boundaries on all lines not located inside the public right-of-way.

11. Fire hydrants, gate valves, and air release valves should be shown.

12. Plan of fire meters or detector meters should be shown if applicable.

13. As-built drawings must be submitted to the City and approved before the final plan is recorded.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 44-24, § 1, 10-3-24)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cartersville/zoning/7.5-122@2026-11-11-feac905dfc