Ir al contenido
Georgia Commons
Menú

Cartersville · Ordenanza de zonificación

Part - CODE OF ORDINANCES / Chapter 7.5 - DEVELOPMENT REGULATIONS / Article II - PLAN REVIEW AND GENERAL REQUIREMENTS

Sec. 7.5-41. Electronic submission of building plans.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

In the event of new construction or additions of over thirty (30) percent of the entire square footage, the following must be submitted and approved by the fire department prior to the granting of a certificate of occupancy by the City of Cartersville.

(1) A hard copy and electronic version of the final site plan and building/construction floor plan which shall be provided in

AutoCAD format (DWG, DXF) or FirezoneCAD format (CZD).

(2) The plans at a minimum shall include:

(a) Building/construction floor plan consisting of the following:

1. All interior and exterior walls with openings for each level of the building both above and below grade;

2. Room labels;

3. Building measurements and dimensions;

4. Roof access;

5. Electrical panels and shutoffs;

6. All life safety items (including but not limited to fire extinguishers, emergency lights, exit signs, fire protection systems, and alarm information); and

7. Other information as required by the City of Cartersville Fire Department.

(b) Site plans shall comply with all other requirements of the City of Cartersville, and additionally, shall include:

1. Fire hydrants;

2. Post indicator valves;

3. Storage tanks;

4. Water and gas shutoffs;

5. Types and purpose of building;

and

6. Other information as required by the City of Cartersville Fire Department.

(3) All plans must be submitted to the Cartersville Fire Department either in person, by U.S. Mail or email as indicated during the plan review process.

(4) The effective date shall be October 1, 2008 and shall be applicable for all

certificate of occupancy's issued after said date.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 30-08, § 1, 9-18-08)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cartersville/zoning/7.5-41@2026-11-11-1df271c785

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cartersville Zoning Ordinance, Sec. 7.5-41. Electronic submission of building plans | Georgia Commons