3.08.04. Provisions for Flood Hazard Reduction

Sobre este texto

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. General Standards. In all areas of special flood hazard the following provisions are required:

1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;

3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;

4) Elevated Buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.

a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:

i. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;

ii. The bottom of all openings shall be no higher than one foot above grade; and

iii. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.

b. So as not to violate the "lowest floor" criteria of this Section, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area, and

c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.

5) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.

6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable State requirements for resisting wind forces.

7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system;

8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters;

9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and

10) Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this Section, shall be undertaken only if the non-conformity is not furthered, extended or replaced.

B. Specific Standards. In all areas of special flood hazard the following provisions are required:

1) New Construction and/or Substantial Improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than two and seven-tenths feet above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of Section 3.08.04.A(4), "Elevated Buildings."

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above two and seven-tenths feet above the base flood elevation.

2) Non-Residential Construction. New construction and/or the substantial improvement of any structure located in Al-30, AE, or AH zones, may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to two feet above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in 3.08.03.C(6).

3) Standards for Manufactured Homes and Recreational Vehicles. Where base flood elevation data are available:

a. All manufactured homes placed and/or substantially improved on:

i. Individual lots or parcels, ii. In new and/or substantially improved manufactured home parks or subdivisions,

iii. In expansions to existing manufactured home parks or subdivisions, or

iv. On a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage" as the result of a flood, must have the lowest floor including basement, elevated no lower than two and seven-tenths feet above the base flood elevation.

b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that, the higher of:

i. The lowest floor of the manufactured home is elevated no lower than two and seven-tenths feet above the level of the base flood elevation, or

ii. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.

c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Refer to Section 3.08.04.A(6))

d. All recreational vehicles placed on sites must either:

i. Be on the site for fewer than 180 consecutive days; or ii. Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions), or

iii. The recreational vehicle must meet all the requirements for "new construction," including the anchoring and elevation requirements of Section 3.08.04.B(3)a. and (3)c., above.

4) Floodway. Located within areas of special flood hazard established in Section 3.08.02.B, are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:

a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.

b. Only if Section 3.08.04.B(4)a. above is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of Section 3.08.04.

c. Removal of trees and other vegetation may not be a consideration in calculating the effect of proposed encroachment on flood levels during the occurrence of the base flood discharge.

5) Floodway Fringe, Lower. Within the lower floodway fringe is the area between the floodway and the upper floodway fringe that is lower than one-half the distance between the floodway and the boundary of the area of special flood hazard. The lower floodway fringe is a transitional area that is hazardous due to its proximity to the floodway and encroachment by fill or development within this area could have serious impact on the entire floodplain. The following provisions shall apply with the lower floodway fringe:

a. Encroachments, including fill, new construction, substantial improvements and other developments shall be prohibited unless certification by a registered professional engineer, with supporting technical data, is provided to the director demonstrating that encroachments shall not result in any increase in flood levels during occurrence of base flood discharge;

b. If Section 3.08.04.A(4)a. is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of Section 3.08.04.

c. The placement of manufactured homes, except in an existing manufactured home park or subdivision, shall be prohibited. A replacement manufactured home may be placed on a lot in an existing manufactured home park or subdivision provided the anchoring standards of Section 3.08.04.A(6), and the elevation standard of Section 3.08.04.B(1), and the encroachment standards of Section 3.08.04.B(4)a. are met.

d. Removal of trees and other vegetation may not be a consideration in effects of proposed encroachment on flood levels during the occurrence of the base flood levels during the occurrence of the base flood discharge.

6) Large Tracts. If a tracts contains over one acre located within the area of special flood hazard, then development or land disturbance on that portion of the tract located within the special flood hazard area shall comply with the standards for lower floodway fringe set forth in subsection B(5).

7) Other Area Unsuitable for Development. Land subject to flooding that is not located within a mapped area of special flood hazard may, at the discretion of the Director of Floodplain Management, be required to comply with any or all standards set forth in this chapter.

8) Grading in the Area of the Special Flood Hazard. Grading (including excavating, filing, or any culmination thereof) shall be prohibited in the area of the special flood hazard except for the following:

a. Minimum land-disturbing activities such as home gardens and individual home landscaping, repairs, maintenance work and other related activities.

b. Agricultural practices involving the establishment, cultivation or harvesting or products of the field or orchard, preparing and planting of pasture land, forestry land management practices including harvesting (where stumps are not removed), farm ponds, dairy operations, livestock and poultry management practices and the construction of farm buildings;

c. Projects permitted by or carried out under the technical supervision of the U.S. Department of Agriculture, U.S. Anny Corps of Engineers, or any other agency of the U.S. Government;

d. Cemetery graves;

e. Excavation for wells or tunnels or utilities;

f. Approved mining, quarrying, stockpiling of rock, sand, gravel aggregates or clay where established and provided by law;

g. Exploratory excavations under the direction of soil engineering geologist;

h. Where consistent with other provisions of this chapter, minimum grading for land development or construction which does not result in topographic changes greater than two feet at any location and which is not for the sole purpose of elevating structures pursuant to Section 3.08.04.B(1) and Section 3.08.04.B(2) of this chapter. In no case, shall fill be transported into the area of special flood hazard.

i. Construction activities at existing industrial sites which were developed before the effective date of the first Floodplain Management Ordinance adopted by Catoosa County, GA as a basis for Catoosa County's participation in the National Flood Insurance Program (NFIP), such as dikes, ditches and ponds.

j. Grading (including excavating, filling, or any culmination thereof) shall be permitted in the Upper Fringe.

9) As-Built Drawings and Certification. Within the area of the special flood hazard, as-built drawings and certifications shall be provided by a registered professional engineer and/or a registered land surveyor pursuant to Section 3.08.03.B(2) and Section 3.08.04.B(2) of this Section and also when required by the site plan regulations or the subdivision regulations. As-built drawings and other certifications may be required in other situations at the discretion of the Director of Floodplain Management.

C. Building Standards for Streams Without Established Base Flood Elevations and/or Floodway (A-Zones). Located within the areas of special flood hazard established in Section 3.08.02.B, where streams exist but no base flood data have been provided (A-Zones), or where base flood data have been provided but a floodway has not been delineated, the following provisions apply:

1) When base flood elevation data or floodway data have not been provided in accordance with Section 3.08.02.B, then the Director shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of Section 3.08.04 only if data are not available from these sources, then the following provisions (2) and (3) shall apply:

2) No encroachments, including structures or fill material, shall be located within an area equal to three times the width of the stream or 50 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in any increase in flood levels during the occurrence of the base flood discharge. However, if detail studies show that the minimum standards of the encroachment could be detrimental to the natural floodplain, the Catoosa County Stormwater Director would make the final determination.

3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (Note: Require the lowest floor to be elevated two and seven-tenths feet above the estimated base flood elevation in A-Zone areas where a limited detail study has been completed). Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of Section 3.08.04.A(4) "Elevated Buildings."

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.

The Director shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.

D. Standards for Areas of Shallow Flooding (AO-Zones). Areas of special flood hazard established in Section 3.08.02.B, may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:

1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of Section 3.08.04.A(4), "Elevated Buildings."

The Director shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.

2) New construction or the substantial improvement of a non-residential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus two feet, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in Section 3.08.03.B(1)c. and Section 3.08.03.B(2).

3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.

E. Standards for Subdivisions.

1) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage;

2) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;

3) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards, and;

4) For subdivisions and/or developments greater than 50)lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the "as-built" data to FEMA in order to obtain the final LOMR.

5) If the planned subdivision shows the floodplain is contained entirely within an open space lot, it may not be necessary to conduct a detailed engineering analysis to develop BFE data. Also, it may not be necessary to develop detailed BFE data in "large-lot" subdivisions or single lot subdivisions that are within the thresholds under subparagraph 60.3(b)(3) of the NFIP regulations when the actual building sites are clearly outside the Zone A area.

F. Standards for Critical Facilities.

1) Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain.

2) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-19-17(2); Ord. No. 09-003, Art. IV, 9-19-23)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:catoosa-county/zoning/3.08.04@2023-09-19-ccc2c3bf84

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Catoosa County Zoning Ordinance, 3.08.04. Provisions for Flood Hazard Reduction | Georgia Commons