Ir al contenido
Georgia Commons
Menú

Catoosa County · Ordenanza de zonificación

Appendix A - CATOOSA COUNTY UNIFIED DEVELOPMENT CODE / Article IX - ADMINISTRATIVE PROCEDURES

9.02.07. Standards for Considering Zoning Changes

Sobre este texto

  • As published by Municode, current through 2023-09-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Standards for Considering Rezoning Applications.

In considering any application for a rezoning, the Board of Commissioners shall balance the interest in promoting the public health, safety, morality or general welfare against the right to the unrestricted use of property. In doing so the Board of Commissioners will consider the following objective factors that are relevant to the application. Emphasis may be placed on those criteria most applicable to the specific use proposed:

1) Will the zoning proposal permit a use that is suitable in view of the use, development and zoning of adjacent or nearby property?

2) Will the zoning proposal adversely affect the existing use or usability of adjacent or nearby property?

3) Does the subject property have a reasonable economic use as currently zoned?

4) Will the zoning proposal result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities, schools, police protection, public health facilities or emergency medical service?

5) Is the zoning proposal in conformity with the policy and intent of the Comprehensive Plan for the physical development of the area?

6) What is the effect on the property value of the subject property should the existing zoning be retained?

7) If denied, will the effect on the subject property's value under the existing zoning be offset by the gain to the health, safety, morals or general welfare of the public?

8) If denied, how does the relative gain to the public compare to the hardship imposed upon the individual property owner?

9) Has the property been undeveloped an unusual length of time as currently zoned, considered in the context of land development in the area in the vicinity of the property?

10) Are these other existing or changing conditions affecting the use or development of the property which give supporting grounds for either approval or disapproval of the zoning proposal?

11) Would the change create an isolated district unrelated to the surrounding districts, such as spot zoning?

12) Are the present zoning district boundaries illogically drawn in relation to existing conditions in the area?

13) Is the change requested out of scale with the needs of the county as a whole or the immediate neighborhood?

14) Is it impossible to find adequate sites for the proposed use in districts permitting such use and already appropriately zoned?

15) Would there be an ecological or pollution impact resulting from major modifications to the land if the request is granted?

16) Is there reasonable evidence based upon existing and anticipated land use that would indicate a mistake was made in the original zoning of the property?

B. Standards for Considering Special Use Applications.

In considering any application for a special use permit, the Board of Commissioners shall balance the particular requirements or need for the proposed use against any depreciating effects of such use on other properties or persons. The Board of Commissioners shall consider the following objective factors. Emphasis may be placed on those criteria most applicable to the specific use proposed:

1) Is adequate space for off-street parking provided?

2) Is the use consistent with the goals, policies, objectives, and intent of the Comprehensive Plan?

3) Is the proposed use consistent with the purpose and intent of the zoning district?

4) Are public facilities such as schools, water or sewer utilities, and police or fire protection adequate to serve the proposed use?

5) Is access into and out of the property adequate to provide for traffic and pedestrian safety, the anticipated type and volume of traffic flow, and access by emergency vehicles?

6) Is the type of street providing access to the use adequate to serve the proposed use?

7) Is the lot size sufficient in relation to the proposed use?

8) Are refuse, service, parking and loading areas on the property located or screened to protect other properties in the area from such adverse effects as noise, light, glare or odor?

9) Will the hours and manner of operation of the special use have no adverse effects on other properties in the area?

10) Will the height, size or location of the buildings or other structures on the property be compatible with the height, size or location of buildings or other structures on neighboring properties?

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:catoosa-county/zoning/9.02.07@2023-09-19-f8c4f93bb9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Catoosa County Zoning Ordinance, 9.02.07. Standards for Considering Zoning Changes | Georgia Commons