Cave Spring · Ordenanza de zonificación
Appendix B - ZONING ORDINANCE / Article VII - USE REQUIREMENTS BY DISTRICTS; SPECIAL DISTRICTS
Sec. 7.5. C-2 general commercial and light industrial district.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
7.5.1 Purpose. The C-2 district is established primarily to encourage the development of general commercial and light industrial uses, as defined in this chapter. Generally not for uses requiring intense manufacturing or industrial activity or heavy traffic, or generating noise.
7.5.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the IND district:
Minimum lot size: One acre, or as required to meet buffers.
Minimum lot width at street right-of-way: 150 feet, or as required to meet Georgia Department of Transportation Guidelines.
Front yard setback (from right-of-way): 40 feet.
Side yard setback (from property line): 20 feet (none if abutting C-2).
Rear yard setback (from property line): 20 feet (none if abutting C-2).
Maximum building and structure height: 50 feet.
7.5.3 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on nonresidential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.