Ir al contenido
Georgia Commons
Menú

Chamblee · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 300 - SUBDIVISION AND DEVELOPMENT STANDARDS AND PROCEDURES / Article 2 - DEVELOPMENT DESIGN STANDARDS

Section 300-15. Access and right-of-way.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Access.

(1) New streets shall be constructed to the roadway construction standards of Section 350-3 of this UDO.

(2) The number and location of driveways and other vehicle access points shall be governed by Section 350-2 or GDOT, where applicable. Vehicular access easements may be provided from a public street indirectly via easement in any one or more of the following circumstances:

a. The easement shall be in a location and the access driveway shall have a width and alignment acceptable to the DeKalb County Fire Rescue Department.

b. The property is a lot of record, as defined herein, but does not meet the minimum frontage requirement of the applicable zoning district. The property must be served by an exclusive access easement which shall be limited to the provision of access to only one principal use or structure.

c. The access easement serves a single-family residence on a lot which is otherwise a buildable lot of record, and which is sharing a common driveway with no more than one other single-family residence.

d. The access easement coincides with a private roadway approved under the code, ordinances, or regulations of the City of Chamblee. All new private roadways must be constructed to the roadway standards of this UDO, and their ownership and maintenance responsibility by private party(s) must be clearly established on the final plat of the development.

e. The access easement serves a buildable lot of record which meets the minimum frontage requirements of Title 2 of this UDO, but at which point the access is not achieved.

(b) Dedication of Street Right-of-Way. Right-of-way for all project public streets, existing and proposed, shall be dedicated in accordance with the street classifications and specifications of Chapter 350 of this Title 3 and the provision of Section 300-24, Final Plat Procedures. Dedication of right-of-way for all private streets shall be done in accordance with the provisions of Subsection 350-3(b) Private Streets.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 743, 12-19-17)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:chamblee/zoning/300-15@2026-11-14-8cb9208715

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Chamblee Zoning Ordinance, Section 300-15. Access and right-of-way | Georgia Commons