Chamblee · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 340 - STORMWATER MANAGEMENT / Article 6 - GROUNDWATER RECHARGE AREA PROTECTION
Section 340-69. Permit requirements and enforcement.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No building permit, rezoning request or subdivision plan will be approved by the City unless the permit, request or plan is in compliance with the groundwater protection standards listed in Section 340-71. The City, its agent officers and employees shall have authority to enter upon privately owned land for the purpose of performing their duties under this Article and may take or cause to be made such examinations, surveys or sampling as the City deems necessary.
(1) The City is hereby designated as the administrator and enforcement officer for this Article.
(2) The City shall have authority to enforce this Article; issue permits hereunder; and address violations or threatened violations hereof by issuance of violation notices, administrative orders and civil and criminal actions. All costs, fees and expenses in connection with such actions may be recovered as damages against the violator.
(3) Law enforcement officials or other officials having police powers shall have authority to assist the City in enforcement.
(4) Any person who commits, takes part in, or assists in any violation of any provision of this Article shall be fined not more than $1,000.00 for each offense. Each violation shall be a separate offense and, in the case of a continuing violation, each day's continuance shall be deemed to be a separate and distinct offense.
(5) The City shall have the authority to issue cease and desist orders in the event of any violation of this Article. Cease and desist orders may be appealed to a court of competent jurisdiction, as identified in Section 340-72.
(6) When a building or other structure has been constructed in violation of this Article, the violator shall be required to remove the structure.
(7) When removal of vegetation cover, excavation or fill has taken place in violation of this Article, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable.
(b) With the exception of certain exempted activities identified in Subsection 340-69(c), applications for a development permit within the Groundwater Recharge Area District shall include a site plan. The following information is required for all site plans:
(1) A map or maps, drawn to a scale of 1 inch equals 50 feet, showing all planned improvements including the width, depth and length of all existing and proposed structures, roads, watercourses and drainage ways, water lines, wastewater and stormwater facilities, and utility installations, shall be provided by the applicant.
(2) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site.
(3) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.
(4) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.
(5) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous to toxic materials.
(6) Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale and vertical scale must be shown in cross-sectional drawings.
(7) All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of the development, result in a considerable increase in the amount of excavation, fill or removal of vegetation during construction of otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of the City. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.
(c) The following activities and developments are exempt from the requirement for detailed site plans:
(1) Single-family detached homes constructed within a subdivision of fewer than five parcels.
(2) Repairs to a facility that is part of a previously approved permitted development.
(3) Construction of minor structures, such as sheds or additions to single-family residences.
(d) The application shall be made to the permits and inspection director and will be reviewed within ten days. The review period shall include the preparation of findings (approval, approval with conditions or disapproval) by the City. The applicant will receive written notification of the findings of the City. Decisions of the permits and inspection director may be appealed to the Mayor and City Council.
(e) A public hearing on the application, to be held before the Mayor and City Council, may be scheduled if requested by a citizen. Public announcement of the hearing shall be printed in a local newspaper of general circulation at least 14 days prior to the hearing. A record of the proceedings shall be made and kept on file by the City Clerk. Any person may testify at the hearing. Decisions of the Mayor and City Council may be appealed to a court of competent jurisdiction identified in Section 340-72.
(f) If construction described in the development permit has not commenced within 6 months from the date of issuance, the permit shall expire. If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 24 months from the date of issuance of the permit. Written notice of pending expiration of the development permit shall be issued by the Planning and Development Director.
Historia
(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.