Section 350-52. Procedures.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Installation of street and pedestrian lights. The installation and operation of lighting fixtures located within the rights-of-way of any public street, road, highway, sidewalk or alley in the unincorporated areas of the City or fixed to any pole, lamppost, standard or other supporting device which is located within such rights-of-way, will comply the following procedures:

(1) Plans and specifications for the proposed installation showing compliance with the standards in this Section shall be submitted to the Planning and Development Director for approval. No installations will be made without this approval.

(2) Roadway or street lighting luminaries or fixtures installed within the public rights-of-way as "security lights" or for the purpose of lighting areas other than the public streets shall require the approval of the Planning and Development Director thereof before installation of such lights.

(3) Fixtures for illuminating areas adjoining the public streets, roads, and the like, such as parking areas and driveways, shall be mounted in such a manner as to ensure that the light pattern is kept off the public roadway. When street or roadway lighting luminaries are to be used for security lighting, they will be mounted on the side of the pole that is opposite from the public street and will be mounted to ensure that the lateral light distribution pattern is parallel to the street and the vertical light distribution at the initial light source is perpendicular to the street.

(4) If lighting fixtures of a type other than those in the classification of street or roadway luminaries are to be used or if the proposed lighting is to be installed outside of public rights-of-way, the plans and specifications submitted will be sufficiently detailed to clearly show that such shall be installed and operated in such a manner to prevent glare from being a hazard to or interfering with the normal use of the public rights-of-way.

(b) Street lights for new subdivisions.

(1) Prior to the approval of a Final Plat, the developer shall submit and prepare a street light design drawn on the approved Preliminary Plat based upon the requirements of this UDO. The design shall be forwarded to the appropriate power provider and the developer shall pay the power provider the appropriate cost for materials and installation. Proof of payment to the power provider shall be required.

(2) All fixtures and poles shall meet the specification requirements of the City pursuant to the specification in Section 350-54 and all maintenance shall be the responsibility of the power provider. The City, in addition to other requirements, may require a light to be located at street intersections within the development.

(3) Upon acceptance of the street light installation by the City, the power provider shall submit monthly bills to the Planning and Development Director for payment. The City shall assign a special assessment to each property abutting a street with street lights for payment of the monthly utility costs in accordance with the provisions of this Chapter 350, Article 4 of the UDO.

(c) Street Light Request Process for Existing Public Streets. This policy follows the standard City process for citizen response to provide uniformity and ensure responsiveness and accountability.

(1) Requests for new street lights and/or changes in existing street lights on existing streets must be made in writing to the Public Works Director. Requests should include the primary concern and an individual contact person for follow up. Requests will be logged into the City's tracking system and included on the list of street light requests.

(2) When an organized group is active, i.e., homeowners association (HOA), civic association or other, the request shall be submitted by that entity. If no formal group exists, the request may be made by an individual or group of individuals.

(3) Requests for street light changes may include, but are not limited to, the following:

a. Additional/fewer lights;

b. Rearrangement of lights;

c. Refurbishing of lights.

(4) Upon receipt of the street light request, a field inspection may be conducted by City staff to determine the existing lighting conditions including number of street lights, locations, spacing, fixture types, poles, and any other pertinent information. An inspection may take place at night hours if deemed necessary.

(5) Findings are documented and the results are presented to the Planning and Development Director for direction. As directed by the Planning and Development Director, the Director shall notify the identified contact person of the findings and recommendations.

(6) If installation is recommended, the community shall circulate a petition to the impacted neighboring property owners. The impacted neighboring property owners are defined as any property owner that has all or a portion of their property within a 250-foot radius of a requested street light modification. The requestor must obtain approval of at least 65% of the property owners petitioned unless a single light is requested, at which point 100% of the property owners must be in favor of the additional street light. All properties in the impacted area must be contacted. If a property owner does not respond, it will be counted as a no vote. If a safety problem can be documented, the Director will recommend to the Planning and Development Director to waive the petition process.

(7) Once the petition is verified, a map shall be drawn of the area showing any existing street lighting.

(8) Contact shall be made by City staff with the power utility provider and a meeting shall take place, if necessary, to discuss various options. The power utility provider shall later supply their recommendations and estimated costs, including installation and monthly billings, to City staff.

(9) The map shall be updated to show proposed lighting and submitted to the Planning and Development Director with all supporting documentation for review. The street light request will be implemented at the direction of the Planning and Development Director.

(d) Appeal of decisions. Should the Planning and Development Director thereof disapprove the request to install or operate lighting fixtures within any public right-of-way, he shall communicate the disapproval in writing to the party requesting the same. The written communication shall include the specific reasons for disapproval. Any appeal of a light or lighting system decision would follow the procedures outlined in Section 280-15.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 743, 12-19-17; Ord. No. 757, 12-18-18)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:chamblee/zoning/350-52@2026-11-14-397662eb0d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Chamblee Zoning Ordinance, Section 350-52. Procedures | Georgia Commons