Ir al contenido
Georgia Commons
Menú

Coffee County · Ordenanza de zonificación

Appendix D - LAND DEVELOPMENT CODE / Chapter 10 - ADMINISTRATIVE PROVISIONS

10-15. Procedures for Approval of Subdivision Plats.

Sobre este texto

  • As published by Municode, current through 2024-10-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. The preliminary plat shall be reviewed by the Zoning Administrator and DRC. If the plat is disapproved, the Zoning Administrator must provide a written statement of reasons for disapproval within ten days of the time of submittal. Where a proposed subdivision includes or abuts on any part of a state highway system, a plat of the proposed subdivision shall be submitted to the Georgia Department of Transportation as required by O.C.G.A. § 32-6-151.

b. The preliminary plat shall then be reviewed by the Planning Commission. The Planning Commission shall forward a recommendation to the County Commission.

c. The County Commission shall review the preliminary plat. Upon approval, the Zoning Administrator shall notify the applicant to proceed with preparation of the improvement plans and final plat.

d. Approved preliminary plats are valid for one year only from date of approval. If final plat or construction drawings have not been submitted within this period, preliminary plat approval becomes invalid and must be resubmitted and must comply with the development standards in effect at the time of the resubmission.

e. The developer shall submit infrastructure and utility plans as required by section 10-12 and final plat as required by section 10-10(c) to the Zoning Administrator. The Zoning Administrator shall have authority to reject the proposed final plat if he finds that it does not conform to the approved preliminary plat or this LDC. If the plat is rejected, the Zoning Administrator shall provide the applicant with a written statement specifying all the respects in which it does not conform. After review, the Zoning Administrator shall submit the plans to the Planning Commission.

f. The Planning Commission shall review the infrastructure and utility plans and final plat and forward a recommendation to the County Commission.

g. The final plat shall be deemed filed with the County when it has been determined to be complete and has been approved by the Board of Commissioners.

h. The approval of a final plat shall not constitute an acceptance by the County of any street, easement or other designation for which the County would have ownership or maintenance responsibility shown upon the plat.

i. Upon satisfactory compliance with these regulations and after approval by the County Commission, the final plat will be forwarded to the Zoning Administrator to retain until such time that all required minimum improvements have been completed. At such time the Zoning Administrator shall forward the as-built plans with proposed dedicated roads to the County Commission for approval and acceptance of any street, easement or other designation for which the County would have ownership or maintenance responsibility shown upon the plat. Upon approval the as-built plans will be released for recording.

j. Acceptance of Infrastructure. Acceptance for maintenance of infrastructure by Coffee County occurs upon approval of said plat and infrastructure by the Coffee County Board of Commissioners by majority vote and recording of said vote in the official minutes. The developer retains responsibility for the maintenance and safety of the development until such acceptance.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:coffee-county/zoning/10-15@2024-10-07-138e036437

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Coffee County Zoning Ordinance, 10-15. Procedures for Approval of Subdivision Plats | Georgia Commons