Coffee County · Ordenanza de zonificación
Appendix D - LAND DEVELOPMENT CODE / Chapter 5 - SUPPLEMENTAL STANDARDS
5-11. Communication Tower/Facility.
Sobre este texto
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. The purpose and intent is to provide a uniform and comprehensive set of standards for the development and installation of communication towers, antenna support structures, antennas and related facilities. These standards are designed to protect and promote public health, safety and community welfare and the aesthetic quality of the County, while at the same time not unduly restricting development of needed telecommunication facilities nor denying wireless communications suppliers' access to the public switched telephone network. These standards encourage managed development of telecommunication infrastructure.
b. All applications shall include a statement of need or necessity, showing that the service cannot be provided through other means, i.e. co-location.
c. All applications shall include the intended service area and existing coverage by service providers.
d. Telecommunication towers shall comply with applicable Federal Aviation Administration and Federal Communications Commission regulations. Evidence of compliance must be submitted prior to issuance of building permits for construction.
e. All certifications required for the construction of telecommunication facilities shall be sealed by a Georgia registered engineer.
f. All telecommunication towers, as well as accessory and support structures including guy anchors shall comply with the applicable zoning district setbacks. For guyed towers, applicants should submit certified break-apart calculations in order for the property boundary setbacks of the tower to be determined. If the applicant does not submit break-apart calculations, the minimum setback from all property lines or the nearest inhabited building shall be 150 percent of the height of the tower, but not less than 200 feet.
g. A wall or fence no less than ten feet in height from finished grade shall be constructed around each telecommunication tower and ground related support or guy anchors. Access to the tower shall be controlled.
h. The County may require, as a condition of approval, the dedication of space on a tower for communications equipment required for public safety. The need for such public use shall be indicated to the applicant prior to formal approval of an application. In the case of co-use with the County, the applicant shall certify that none of the proposed or future users of the tower shall interfere with its use by the County for public safety.
i. In addition to the landscaping requirements per chapter 4 of this Code, landscape buffers shall be required around the perimeter fencing of the telecommunication tower and any accessory uses, including guy anchors. Landscape buffers shall be located outside and within ten feet of the required fence and shall include not less than one tree and suitable ground cover for every 20 linear feet of fence. In addition, a hedge shall be installed around the exterior perimeter of the fence.
j. A 12-foot wide stabilized access driveway is acceptable to a telecommunication tower, unless the Zoning Administrator determines, based on public safety concerns, that circumstances require paved access. The turn-around area shall be approved by the County, and Fire Chief.
k. A minimum of one on-site parking space shall be provided. The parking area shall be paved if the access road is paved.
l. Telecommunications towers and accessory structures shall be unoccupied.
m. A tower may constitute an accessory use on a lot containing a separate principal use. If the tower constitutes a principal use, then it must be located on a property which meets the minimum lot size requirements of the district in which the tower is located and is large enough to accommodate the tower, accessory structures, landscaping, parking and other required improvements.
n. The use of any portion of a tower for signs or advertising is prohibited.
o. The following distances shall be measured by a straight line measurement without regard to intervening buildings from the nearest point of the building or unit within a building in which the proposed telecommunications tower is to be located to the nearest point of the lot, use, right-of-way line or district from which the proposed telecommunications tower is to be separated.
1. No telecommunications tower shall be constructed within 500 feet of any residential zoning district within the County or within 500 feet of a residential area outside of the County.
2. No telecommunications tower shall be constructed within 500 feet of a school.
p. An unused tower shall be removed within three months of cessation of all telecommunications uses.
q. Existing non-conforming towers may be replaced one time by a tower of equal or lesser height.
r. Temporary facilities known as "cells on wheels" shall be allowed for periods up to 30 days during documented states of emergency as declared by the County Commission, and for special events subject to review and approval of the Zoning Administrator.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.