5-45. Scrap and Waste Recycling Operations.

Sobre este texto

  • As published by Municode, current through 2024-10-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. The collection operations shall be limited to the acceptance of glass, plastic, paper, cardboard, metal cans, non-ferrous materials and yard waste.

b. The property on which the collection activity is to take place, shall be at least one acre and not more than ten acres in total area.

c. The property on which the collection activity is taking place shall be surrounded by a fence, wall or vegetative screening eight feet in height. Such fence or wall shall be of similar composition, construction, and color throughout and shall be constructed without openings except or one entrance and one exit. The entrance and exit shall be equipped with unpierced gates which shall be closed and securely locked outside of business hours.

d. The reprocessing of the collected material into any other product, by-product or other use or form is not allowed, unless the reprocessing is allowed in conjunction with manufacturing of a new product or material as would otherwise be permitted in WLI (Warehouse Light Industrial) or H-I (Heavy Industrial) zoning districts.

e. No junked vehicle or any other junk or scrap shall be located for storage, dismantling or any other purpose.

f. All sides of each individual stockpile areas shall be accessible by fire lanes. Fire lanes shall be a minimum of one and one-half times the height of the pile, but in no case shall the fire lane be less than 20 feet wide.

g. The total site that may be covered with debris storage areas shall not exceed 60 percent of the site.

h. The base area on which the stockpiles are located, and the access aisles between the stock piles, must be constructed of either a concrete surface, asphalt surface, or other clean all weather stabilized surface that is acceptable to the County.

i. Every recycling, scrap, waste and salvage/junkyard operation authorized under this section, shall establish a cash security fund, bond or provide the County with an irrevocable letter of credit based on the schedule below, to secure the cost of removing of all accumulated debris and materials from the site if it has been determined by the County Commission, following a duly noticed public hearing, that the recycling, scrap, waste or salvage/junkyard operation has been abandoned or operations have ceased for a period in excess of six months or the permit has been revoked for any reason. The provisions of this paragraph shall not apply to and recycling, scrap, waste or salvage/ junkyard operation operated by any unit of local government within the County.

Yard Size Required Security Less than 5 acres $75,000.00 More than 5 acres to 10 acres $125,000.00

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:coffee-county/zoning/5-45@2024-10-07-aa20336a78

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Coffee County Zoning Ordinance, 5-45. Scrap and Waste Recycling Operations | Georgia Commons