Coffee County · Ordenanza de zonificación
Appendix D - LAND DEVELOPMENT CODE / Chapter 5 - SUPPLEMENTAL STANDARDS
5-48. Temporary Uses, including Special Events and Structures.
Sobre este texto
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. Temporary Uses are permitted in any zoning district subject to the following standards, provided that all temporary uses shall meet the dimensional and parking requirements for the zoning district in which the use is located.
b. Permitted Temporary Uses.
1. Construction offices, which may also be used for security purposes, and equipment sheds in which erection, addition, relocation or structural relocation is taking place provided that such use shall be limited to the period of actual construction.
2. Manufactured Homes may be used as construction offices in any district in which erection, addition, relocation, or structural relocation is taking place provided that such use shall be limited for the period of actual construction, tie down permits shall be obtained; all such manufactured homes shall comply with applicable regulations; and the manufactured home in which the security employee lives shall not remain after the period of actual construction.
3. Religious Facilities in existing structures in C (Commercial) zoning districts. Such use shall be limited to the worship activities of the named applicant for the temporary use permit including educational programs conducted in conjunction with the worship service, but shall not include child care programs conducted independently from the worship service or the establishment of schools.
4. Temporary On-Site Real Estate Offices. Included as part of site plan approval, specific authorizations may be granted permitting the installation or construction of a temporary on—site sales office prior to the issuance of any building permits for the primary portions of a development project. All on-site sales offices shall be constructed in accordance with applicable County regulations shall be required to obtain all necessary permit approvals, including but not limited to Stormwater management permits, driveway permits and all required building and public health permits. All temporary on-site sales offices shall be removed from the development site upon the completion of the last phase or unit of the approved development.
5. Special vehicle and boat sales events on sites not approved for the permanent display vehicle and boat sales may be approved by the Zoning Administrator provided that these events shall be conducted on property having a C (Commercial) or WLI or HI (Light Industrial or Heavy Industrial) designation or on property approved and designated by the County as special events sites. Such events shall be conducted on property with existing, permanent and permitted driveways and access points. The event shall have a duration of four or fewer consecutive days and shall be conducted by one or more dealers having a valid local business license. Sanitary facilities shall be provided in accordance with applicable Health Department regulations. Used Motor Vehicle Dealers must have a Temporary site permit issued by the Georgia State Board of Used Motor Vehicle Dealers before the County issues a local occupational license.
6. Temporary RV Hunting Camps.
a. A "hunting camp unit" is defined as any temporary domicile, excluding mobile or manufactured housing. Examples include, but are not limited to: RV's, travel trailers, sheds, tents, shacks, buses and vans. Occupancy is limited to 120 continuous days
b. Sanitary facilities shall conform to County and state health regulations. Each hunting camp shall have one "porta-toilet" per every five hunting camp units (RV, travel trailer, tent, or shack).
c. All units must be self-contained or generator powered.
d. All structures and activity areas shall be located at least 300 feet from all property lines.
e. Activities shall not result in the destruction, loss or damage of a natural, scenic, or historic feature.
f. Outside storage and game processing areas shall be appropriately screened from view on all sides.
g. All parking and camping structures shall be screened by forest or landscape at a minimum distance of 300 feet from property boundary lines or public roads and rightsof-way. If this cannot be accomplished by natural means year round, then this will be accomplished by a six-foot privacy fence constructed from pressure treated material and located a distance of not less than 300 feet from property line and/or public roads and rights-of-way.
[h. Reserved.]
[i. Reserved.]
j. For the purpose of zeroing, sighting, and target practice, appropriate earth berms and mounds shall be constructed so as to prohibit projectiles from leaving the firing range. No zeroing, sighting, or target practice shall occur after sunset.
k. Hunting camps must have 911 designation numbers at road entrance. Numbers must be visible from the road.
l. All camps must be accessible for zoning, code enforcement and tax assessing purposes.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.