9.3. Permits.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Application requirements. All applications for sign permits must be complete and contain all required information. The chief building inspector shall deny any application upon a determination that the application does not contain all required information as set forth in this Article, or that such information is not sufficient to determine whether the permit should be issued or denied.

B. Permit required. It shall be unlawful for any person to erect, repair, alter, relocate or maintain any sign as defined in this Article, except for those signs exempt from this Article, without first obtaining a permit from the chief building inspector in the manner set forth in this Article. It shall be unlawful to erect any sign not expressly permitted by this Article.

C. Permit application. Application for permits to erect signs shall be made upon forms provided by the inspections department, and shall contain or have attached thereto the following information:

1. Name, address and telephone number of the applicant;

2. Address of building, structure or lot upon which the sign is to be attached or erected;

3. The type of sign to be erected, the area of the sign, the height of the sign, the shape of the sign, how the sign is to be illuminated (if at all), and position of the sign in relation to nearby buildings or structures, property lines and other signs located on the lot;

4. Five (5) sets of accurately-scaled, color drawings of the plans, contents, specifications and method of construction and attachment to the building or the ground for the sign as well as a scaled drawing of the site showing drives, structures and any other significant site features;

5. Name of person erecting the sign, that is, the contractor or builder;

6. Written consent of the owner of the building and/or lot upon which the sign is to be erected;

7. If a wall sign, the dimensions of the wall on which the sign is to be placed with appropriate drawings and photographs;

8. A written list describing all other signs located on the lot indicating the sign type, size and placement.

D. Approval of chief building inspector. Approval of the chief building inspector must be obtained prior to erection of any sign for which a permit is required. Such officer shall examine the plans and specifications to determine whether the proposed sign complies with the building code of the city, this Article, and any other applicable provisions of the city Code, and shall then indicate his approval or denial thereon.

E. Submission of sign permit applications.

1. All permit applications must be delivered to the inspections department at City Hall.

2. All permit applications must be stamped by the inspections department indicating the submission date.

3. Permit applications pertaining to lots in the downtown business district shall be promptly forwarded by the chief building inspector to the Main Street manager for review. Such applications must be returned to the chief building inspector within fourteen (14) days of the submission date with a recommendation for approval or denial and reasons therefor. If not returned by the Main Street manager within said fourteen (14) days with a recommendation, the recommendation shall automatically be deemed to be for approval.

F. Permit fees. Each application for a sign permit must be accompanied by a payment in the amount of the permit fee. The permit fee shall be as established by Mayor and Council from time to time.

G. Issuance, denial and revocation of permit.

1. Upon receipt of a complete application, the payment of all permit fees, the application contains no false material statements, and a determination that the proposed sign and the lot upon which the sign is to be placed comply with all requirements of this Article and all other applicable ordinances and laws of the city, the chief building inspector shall issue the permit;

2. Permits concerning applications submitted to the Main Street manager cannot be issued by the chief building inspector prior to review and recommendation of the Main Street manager; and

3. All sign permit applications shall be issued or denied within thirty (30) days of the submission date. Incomplete applications shall be rejected and a new application shall be submitted with all of the required information and assigned a new submission date. Should a decision on the application not be made prior to the expiration of a thirty-day period, the applicant shall be permitted to erect and maintain the sign under this statutory provision unless and until such time as the chief building inspector notifies the applicant of a denial of the application and states the reason(s) for the denial. No person erecting a sign under this provision shall acquire any vested rights to continued maintenance of such signs, and should the chief building inspector subsequently deny the application, the sign must be brought into compliance with this Article; and

4. Upon making a final decision, the chief building inspector must stamp each application with a decision date and shall notify the applicant of such decision within three (3) days of the decision date in writing via hand delivery, certified mail, fax or e-mail to the address indicated on the application. If the decision is to deny the application, the reasons for said denial must be definitively stated.

H. Time period. If the work authorized under a permit has not been completed within six (6) months following the date of issuance, the permit shall become null and void. A sixty-day extension may be granted to the six-month limit to alleviate hardship upon proof of hardship beyond the ability of the permit holder to rectify. No refunds will be made for permit fees paid for permits that expired due to failure to erect a permitted sign. If an individual later desires to erect a sign at the same location, a new application must be processed and another fee paid in accordance with the fee schedule applicable at such time.

I. Display of permit. Every sign constructed, erected or maintained for which a permit is required by this Article shall be plainly marked with the permit number issued for the structure. The permit number shall be firmly affixed thereon in a durable and readily accessible manner.

J. Altering permit. Displaying a permit that has been tampered with, altered or mutilated, or displaying a sign without a permit shall constitute a violation of this Article punishable in Municipal Court.

K. It shall be unlawful for any person to engage in a business of erecting or maintaining signs within the city unless and until such entity shall have obtained an occupation tax certificate in the state and a certificate of insurance from an insurance company authorized to do business in the state evidencing that the entity has in effect public liability and property damage insurance in the sum of twenty-five thousand dollars ($25,000.00) for property damage for any one claim, and public liability insurance in an amount not less than one hundred thousand dollars ($100,000.00) for injuries, including accidental death, to one

(1) person. The certificate of insurance shall state that the insurance carrier shall notify the city thirty (30) days in advance of any termination and/or restriction of the coverage, including nonrenewal, cancellation, and non-payment of any premium. If the business has comparable insurance from another City or County in Georgia, the installer's insurance provider shall provide a current certificate of insurance to the city, prior to the installation of signage.

L. Revocation. If the chief building inspector finds that a sign permit was issued pursuant to an incomplete application, application containing false material statements, the permit was erroneously issued, or the sign violations the requirements of the permit or any other applicable provisions of this Article, the Chief Building Inspector may revoke the permit by issuing a letter of revocation to the permit holder. The aggrieved permit holder shall have the right to appeal said revocation in accordance with the appeal provisions stated herein.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2018-09, § 1, 10-1-18)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:college-park/zoning/9.3@2026-11-11-df80dff7ab

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

College Park Zoning Ordinance, 9.3. Permits | Georgia Commons