Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 2 - OVERVIEW OF PROJECT CONSTRUCTION

Section 8.2.3. Development Phase Inspections.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The owner or contractor shall make requests for inspections to the Engineering Department at least 24 hours prior to when the inspection is needed. Inspections shall be made and passed prior to continuation of further activity or proceeding into new phases. Inspections are required of each of the following phases, as applicable to the actual work to be performed under the development permit:

A. Preclearing Inspection Required. Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis.

B. Inspection on Completion of Street Grading. Upon completion of grading for each street section, inspection and approval shall be required prior to trenching or continuation with subgrade preparation.

C. Cover Inspection. A cover inspection prior to burial of any underground drainage structure.

D. Stormwater Facilities Inspection. Upon installation of storm drainage pipe, detention, or other stormwater facilities.

E. Street Curbing and Gutter Inspections. Inspection shall be requested after the forms or string line have been set. Street width and vertical and horizontal alignment may be spot-checked.

F. Sub-grade of Streets. After compaction, the sub-grade shall be roll tested with an 18-ton load on a tandem dump truck and shall pass to the satisfaction of the Engineering Director.

G. Street Base. After receipt of compaction test reports by the Engineering Department, the base may be string-lined for depth and crown. The street base may be roll-tested with an 18-ton load on a tandem dump truck and shall pass to the satisfaction of the Engineering Director.

H. Paving. An Engineering Department Inspector shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored.

I. Failure to Notify. If the contractor fails to make the proper notification, he shall be responsible for the expense of any operation or laboratory testing required by the Director of Engineering to ascertain compliance with the specifications.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:columbus-muscogee/zoning/8.2.3@2026-11-11-a79c8c7d60

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Columbus Zoning Ordinance, Section 8.2.3. Development Phase Inspections | Georgia Commons