Columbus · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 2 - OVERVIEW OF PROJECT CONSTRUCTION
Section 8.2.6. Maintenance Bond.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Maintenance Bond Required. Prior to approval of a final subdivision plat or issuance of a certificate of occupancy, a maintenance bond in a form acceptable to the Department of Engineering is required for all public improvements shown on the as-built surveys. The owner shall be responsible for maintenance of all such public improvements for two years from the acceptance of the improvements by Council.
B. Value of Bond. The value of the maintenance bond shall be equal to five percent of the actual cost of construction of the public improvements shown on the as-built surveys. The cost of construction shall be determined by the Director of Engineering or evidenced by copies of contractor agreements or actual invoices paid.
Historia
(Ord. No. 09-4, § 1, 1-27-09)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.