Columbus · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 8 - REPAIR, INSTALLATION AND CONSTRUCTION ON ALL RIGHTS-OF-WAY
Section 8.8.12. Trenchless Technology.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Directional Drilling - Backwash created by directional boring shall be controlled by use of proper erosion control measures including capture and proper disposal of backwash using a vacuum truck or other pre approved methods. Backwash shall not be discharged into any part of the storm sewer system including ditches, or onto the street, gutter or sidewalk. Boring, auguring or any other type subsurface means of utility installation shall be used for the following:
A. Installation of new underground utilities in areas that have established vegetation, i.e., landscaping, established lawns, etc. Replacement or upgrading of existing utilities where the existing utility shall remain in place and/or abandoned.
B. Road crossings except where conditions prohibit the process of directional drilling or boring.
C. Installation of new underground utilities in areas that are within the drip line of any trees on the right-of-way. A minimum depth of 3 feet is required to protect the roadbed and critical root zone for trees unless otherwise approved due to subsurface conditions. The City Arborist shall be notified of any trenching/cutting done within the drip line of a tree before the work is begun.
(Refer to Chapter 4 of this UDO for more detail.)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.