A building-mounted solar energy system shall be subject to the following regulations:
(a) Location. Building mounted solar energy systems shall be allowed in all zoning districts.
(b) Placement.
1. No solar energy system shall be mounted or affixed to any freestanding wall or fence.
2. Panels and building mounts shall be installed per manufacturer's specifications.
3. In residential zoning districts, the townhouse developments, the office institutional district, the neighborhood business district and in the central business district, a solar energy system for aesthetic reasons, shall not be located on the front slope of a pitched roof of a principal residential structure unless no other location for the solar energy equipment is feasible. The city may require sun and shadow diagrams specific to the installation to ensure compliance with this provision.
4. Glare: All solar panel energy systems shall be placed such that concentrated solar radiation or glare does not project onto nearby structures or roadways.
(c) Height. Building-mounted solar panels or systems shall not exceed four feet above the height of any principal building on the site. Principal building is defined as a building in which is conducted the principal use of the lot on which it is situated. In any residential district, any dwelling shall be deemed to be a main building on the lot on which it is situated.
(d) Permits and Code Compliance. A building permit shall be required for installation of all building-mounted solar energy systems.
(e) Additional Submission Requirements. In addition to requirements for information to be provided during the site plan review and development permitting process, the facility shall not be approved for operation until the following are submitted:
1. Copy of all lease agreements and solar access easements.
2. Where interconnection to an electric utility grid is proposed, the applicant shall submit evidence that the electrical utility provider has been informed of the customer's intent to install a connection with the local electric utility grid. A copy of the approval from the local utility must also be provided before operation of an interconnected facility will be authorized.
3. A decommissioning plan for the anticipated service life of the facility or in the event that the facility is abandoned or has reached its life expectancy.
4. The City may require other studies, reports, certifications, and/or approvals be submitted by the applicant to ensure compliance with this section.