Ir al contenido
Georgia Commons
Menú

Cordele · Ordenanza de zonificación

Appendix A - ZONING / Article IV - PROCEDURES FOR SUBDIVISION PLAT APPROVAL

Section 445. Abbreviated procedure for lot splits.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

445.1 Projects eligible for abbreviated procedure. A single tract proposed to be subdivided into three or fewer parcels or a previously subdivided parcel under single ownership that is to be resubdivided into three or fewer lots constitutes a "lot split" under these regulations. Such a subdivision is not required to submit a Preliminary Plat, Construction Plans, and Final Plat;

said subdivisions may be approved through a shortened approval process as set forth in this section.

445.2 Design requirements. Subdivisions subject to the shortened review process shall be subject to the design standards and required improvements established in Article VI and Article VII of this Ordinance.

445.3 Review procedure. Subdivisions eligible for abbreviated review under this section shall adhere to the following procedures:

(a) Survey required. An accurate survey of the tract of the proposed lot split or of the previously subdivided parcels and the re-subdivision thereof shall be prepared by a land surveyor registered in the State of Georgia, and shall be submitted to the City Engineer, or his designated representative.

(b) Review by city staff. The Director of Community Development shall review the proposed lot split to insure compliance with all design and improvement requirements of these regulations and shall prepare a written report thereon, which shall be forwarded to the Planning Commission not more than seven (7) days after receipt of the application for a lot split for consideration at the next regular meeting of the Planning Commission.

(c) Planning commission review. If the application is approved at the next regular meeting of the Planning Commission, it shall be certified by the signature of the Chairman of the Planning Commission and attested by the Secretary of the Planning Commission.

If the application is denied, the reasons for denial shall be stated in writing, with reference made to the express provision(s) of these regulations to which the proposed lot split does not conform, and shall be transmitted to the applicant.

(d) Lot splits proposing deviation from ordinance or dedications. Whenever a deviation is required from the improvement requirements set forth in these regulations, or a street or other element is to be dedicated, the action of the Planning Commission shall be forwarded to the City Commission for its approval and acceptance of dedications. For all other types of lot splits, the action of the Planning Commission shall be final.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cordele/zoning/appendix-a-article-iv-445@2026-11-11-3f64c2d419

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cordele Zoning Ordinance, Section 445 (Appendix A, Article IV). Abbreviated procedure for lot splits | Georgia Commons