Cumming · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article IV - DESIGN REQUIREMENTS / Division 4 - LOTS AND BLOCKS
Sec. 109-305. Monuments.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
For all subdivisions, a state-registered land surveyor shall install permanent survey monuments at all property corners and land lot lines, prior to final plat approval. Lot corners shall be
marked with metal rods not less than one-half inch in diameter and 18 inches in length and driven so as to be stabilized in the ground. Permanent survey monuments shall also be installed in accordance with the most recent edition of
section 180-7-.05 Monument of the Rules of State Board of Registration for Professional Engineers & Land Surveyors and the Georgia Plat Act
(O.C.G.A. § 15-6-67).
Historia
(Ord. of 2-18-2003, § 708)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.