Ir al contenido
Georgia Commons
Menú

Cumming · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article IV - DESIGN REQUIREMENTS / Division 5 - EASEMENTS AND UTILITIES

Sec. 109-331. Water system.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All water mains shall be installed along with a service connection for each lot or land development and be in operating condition prior to final plat approval if required and paving installation.

This system shall be connected to the city water system in a manner that meets all current specifications of the city utilities department, or a source accepted by the county health department.

All pipes, valves, and other components shall conform to all current specifications and regulations and city utilities department.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 2-18-2003, § 803; Ord. of 5-17-2005(02), § 7)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cumming/zoning/109-331@2026-11-11-390f58efe2

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.