Cumming · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article V - STORM DRAINAGE AND WATERSHED PROTECTION
Sec. 109-367. Residential stormwater facility easements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The developer shall execute a 20-foot drainage easement surrounding the entire perimeter of the facility. The easement boundary will be measured from the 100-year stormwater ponding limits or six inches above the elevation of the overflow.
Additionally, all associated piping, channels, ditches, streams or other areas that are designed for stormwater to flow to and from the stormwater management facility shall require a 20-foot easement measured ten feet in both directions from the appropriate centerline. A 20-foot easement
shall connect the facility to the nearest public road. The easement will be in favor of the city to allow the city to inspect and maintain the facility as necessary. No obstruction shall be built, constructed or planted that would inhibit proper function of the facility and its associated drainage
systems. No fences or planting of shrubbery shall be allowed on the access easement. No portion of the easement shall be steeper than 3:1.
Historia
(Ord. of 3-16-2004(02), § III(10.12))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.