29.03. Manufacture.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Testing and inspection. Acceptability of the units shall be determined by the results of crushing tests on concrete cylinders and by inspection during manufacture to determine their conformance with the design and workmanship prescribed in these specifications and on the plans.
The units shall be considered ready for acceptance regardless of age when they conform to the strength requirements, as indicated by the specified tests.
The manufacturer shall furnish such facilities and assistance as is required to carry on the sampling and testing in an expeditious and satisfactory manner.
B. Reinforcement. Reinforcement shall be as shown on the plans, with the following permissible variations in position:
Except at pipe connections, variations in the position of the reinforcement shall exceed 1 /4
inch from the position shown in the design. The cover on the reinforcement shall not be less than that shown on the plans.
C. Casting. The concrete in each unit shall be placed without interruption, and shall be consolidated by the use of an approved vibrator, supplemented by such hand-tamping as may be necessary to force the concrete into the corners of the forms and prevent the formation of stone pockets or cleavage planes.
1. Holes or pipes. Each hole shall be approximately four inches larger than the outside diameter of the pipe for which it is provided.
D. Curing. The units shall be cured by one or more of the methods given herein for a sufficient length of time so that the concrete will develop the specified compressive strength.
1. The units may be placed in a curing chamber, free from outside drafts and cured in a moist atmosphere not exceeding 160 degrees F. maintained by the injection of steam for such time and such temperature as may be needed to obtain proper curing. The curing chamber shall be so constructed and the units so placed as to allow full circulation of steam around each entire unit.
2. The units may be cured by being kept wet for not less than 72 hours under normal summer temperature conditions. In colder weather the water curing period shall be extended, as directed by the engineer, to provide equivalent curing. The units shall be protected from freezing from the time the concrete is placed and until curing is completed.
E. Removal of forms. The forms shall remain in place until they can be removed without damage to the unit.
F. Workmanship. The units shall be true to shape and their surfaces shall be smooth, dense and uniform in appearance. Minor surface cavities or irregularities which do not impair the service value of the unit and which can be corrected without marring its appearance shall be pointed with approved mortar as soon as the forms are removed. Such minor defects shall not constitute cause for rejection.
G. Compressive strength. Compression tests for satisfying the minimum strength requirements shall be made on cylinders. A minimum of three cylinders will be made from each day's pour and cured in the same manner as the precast units.
H. Rejection. Units shall be subject to refection because of failure to meet any of the requirements specified above; and in addition, any or all of the following defects shall be sufficient cause for rejection:
1. Defects that indicate imperfect mixing and molding.
2. Defects indicating honeycombed or open texture.
3. Exposure of the reinforcement when such exposure would indicate that the reinforcement is misplaced.
I. Marking. Each unit shall bear the name or trademark of the manufacturer and the date it was cast, stenciled or otherwise placed thereon in such a manner as to be clearly legible at time of delivery.
J. Testing. Method of test shall be in accordance with the following:
Compressive Strength AASHTO: T22 and T24 Sec. 30 - Grassing.
30.01 Grassing. The grassing specification to be used in the Unified Government of CussetaChattahoochee County specifications shall be the "Manual for Erosion and Sediment Control in Georgia." The specific sections appertaining (but not limited to) Disturbed Area Stabilization Ds 1, and Ds 3, indicated in Chapter 6, pages 6-161 through 6-182.