Appendix B - SUBDIVISION REGULATIONS
SECTION 3. PROCEDURES FOR SECURING APPROVAL OF SUBDIVISIONS
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(A) Introduction.
Whenever any subdivision of land is proposed to be made, or before any contract for the sale of, or any offer to sell any lots in such subdivision or any part thereof is made, or before any permit for the erection of a structure in such proposed subdivision shall be granted, the developer or his duly authorized agent, shall apply for approval of such proposed subdivision in accordance with the following procedures.
(B) Nonresidental subdivisions.
1. General. If a proposed subdivision includes land that is zoned for commercial or industrial purposes, the layout of the subdivision with respect to the land shall make provision as the Planning Commission may require. A nonresidential subdivision shall also be subject to all the requirements of site plan approval set forth in the Zoning Ordinance. Site plan approval and nonresidential subdivision plat approval may proceed simultaneously at the discretion of the Planning Commission. A nonresidential subdivision shall be subject to all the requirements of these regulations, as well as such additional standards required by the Planning Commission, and shall conform to the proposed land use and standards established in the Comprehensive Plan, Official Map, and Zoning Ordinance.
2. Standards. In addition to the principles and standards in these regulations, which are appropriate to the planning of all subdivisions, the applicant shall demonstrate to the satisfaction of the Commission that the street, parcel, and block pattern proposed is specifically adapted to the uses anticipated and takes into account other uses in the vicinity. The following principles and standards shall be observed:
a. Proposed industrial parcels shall be suitable in area and dimensions to the types of industrial development anticipated.
b. Street rights-of-way and pavement shall be adequate to accommodate the type and volume of traffic anticipated to be generated thereupon.
c. Special requirements may be imposed by the local government with respect to street, curb, gutter, and sidewalk design and construction.
d. Special requirements may be imposed by the local government with respect to the installation of public utilities, including water, sewer, and storm water drainage.
(C) Optional pre-application procedure.
(1) At his option, a developer may prepare a sketch plan of the proposed subdivision for review by the Planning Commission and County Engineer. The sketch plan should include the tentative layout of streets, the total acreage of the proposed development and the approximate number of acres to be devoted to each land use if more than one land use is being considered. The sketch plan should also include the approximate number and size of lots, any unusual topographical features, such as watercourses, ground water recharge area wetlands; and any and all areas located within the flood hazard areas as defined in the Flood Plain Ordinance of the Unified Government of Cusseta-Chattahoochee County, Georgia.
(2) The sketch plan and all discussions regarding it will be considered as being confidential between the developer and the Planning Commission and County Engineer.
(3) Favorable consideration by the Planning Commission under no circumstances shall be construed as preliminary or tentative plat approval.
APPENDIX B—SUBDIVISION REGULATIONS Sec. 3, (C)
(D) Submission of preliminary plat.
(1) Application.
a. Prior to filing of an application for the approval of a final plat which includes the dedication and acceptance of a new public street or other public improvement, the developer shall file an application for consideration of a preliminary plat of the proposed subdivision
b. The subdivider or his agent shall submit at least six black or blue line prints drawn at a scale no smaller than 100 feet to one inch of the proposed subdivision to the Planning Commission for its review. The Planning Commission may send one copy to the County Engineer for informational and review purposes.
c. Preliminary plats shall be submitted to the County a minimum of 30 days prior to the next regularly scheduled Planning Commission meeting.
(2) Information to be Submitted. Preliminary plats shall, at a minimum, show the following:
a. Proposed subdivision name or identifying title.
b. Name of the owner of the land to be subdivided or his authorized agent (if any), name of adjacent property owners or subdivisions and of the developer, if other than the owner of the land.
c. Date, north point, scale, and identification of land district and land lots.
d. Existing streets, weather such streets are public or private, utilities, easements, watercourses, and structures on the tract.
e. Lot and/or block numbers in consecutive order.
f. Total number of lots and acreage in proposed development.
g. Contours drawn at five foot intervals or as may otherwise be approved by the Planning Commission.
h. Any and all land located within a flood hazard area as defined in the Flood Plain Ordinance of the Unified Government of Cusseta-Chattahoochee County, Georgia, ground recharge area and wetlands, as defined by the Georgia Department of Natural Resources.
i. A sketch of the prospective future street system of the unsubmitted part when the preliminary plat submitted covers only a part of the developer's entire holdings and weather such street systems will be public or private
k. Developer letter stating that the proposed plat is being submitted for review. This letter shall state the developer's intent as to the final ownership of any new roads included on the proposed plat, if applicable.
(3) Planning Commission Review of Preliminary Plats. Before acting on the preliminary plat, the Planning Commission may request a report from any person or agency directly concerned with the proposed development such as the District Highway Engineer, the County Engineer, West Central Georgia Regional Health Department, the County Water Superintendent, the Superintendent of Schools, and public utility companies. Such reports shall certify compliance with or note deviations from the requirements of these regulations and include comments on other factors affecting the public interest.
The Planning Commission is responsible for securing said reports.
(4) Preliminary Plat Approval.
a. A preliminary plat can only be reviewed by the Planning Commission if the preliminary plat has been properly placed upon the agenda. At a regularly scheduled meeting the Planning Commission shall take action on a preliminary plan to either approve, (with or without) modifications, disapprove, or table until the next regularly scheduled Planning Commission meeting. A preliminary plat shall be tabled by the Planning Commission only if the Planning Commission finds that more information is needed prior to Planning Commission action. A preliminary plat may be tabled only one time unless substantial new information is presented at the subsequent meeting.
b. If the Planning Commission disapproves or approves conditionally the preliminary plat, the reasons for such action shall be stated in writing and reference shall be made to the specific sections of the regulations with which the preliminary plat does not comply. Notification shall be prepared by the Planning Commission staff and forwarded to the applicant.
(E) Submission of construction plans.
(1) After obtaining approval of the preliminary plat, the developer or his agent shall submit six black or blue line prints (or a number as specified by the County Engineer) of construction plans as outlined below to the County Engineer for his review. Sanitary sewer systems are under the jurisdiction of the West Central Georgia Regional Health District and plans shall be submitted to that department as required by law or as is otherwise necessary to obtain final plat approval as required herein.
(2) Detailed construction plans shall be prepared by an engineer registered and licensed in the State of Georgia and shall be prepared in accordance with the design specification set forth in these regulations.
(3) Construction plans shall, at a minimum, consist of the following:
a. A field measured topographic map drawn at two foot intervals showing existing and proposed contours.
b. Layout plans and centerline profiles for each proposed public street or private street extension.
c. Layout and profiles of storm drain pipes and structures along with information on any adjacent property such as, but not limited to, topography and structures which might affect the design of the aforementioned utilities.
d. Design specifications for any bridges or culverts which might be incorporated into the proposed subdivision.
e. Design specifications for sanitary sewer systems as required by the West Central Georgia Regional Health District.
f. Results and locations of percolation test for on-lot sewage systems.
g. Complete curve data for all horizontal and vertical curves. To include delta angle, radius, tangent and P.C. and P.T. stations for horizontal curves, and length of curve, tangent grades, PVC and PVT stations for vertical curves.
h. The design speed used in computing curve data for subdivisions is 30 mph.
i. The design speed for collector streets is 45 mph.
j. The design speed for major arterial streets is 55 mph.
k. Hydrology and hydraulic report of pre-construction and post-construction development for the entire site is required.
l. Soil erosion and sediment control plan for the disturbed area (portions) of the site. All plans must meet State standards for land disturbing activity permits.
m. Clearing and disturbance limits.
APPENDIX B—SUBDIVISION REGULATIONS Sec. 3, (E)
n. Standard details for construction (structures, drainage, roadway, etc.).
(4) Permit to develop. Following the approval of the Construction Plans by the Planning Commission, the County Engineer shall issue a Permit to Develop for the Proposed Plat. The Permit to Develop allows the developer to proceed with construction of the development in compliance with these regulations.
Additionally, the developer may offer lots in the proposed subdivision for sale, transfer, or lease, provided, however, that no sale, transfer, or lease may be completed or recorded until after the final plat has been recorded in the office of the Clerk of Superior Court pursuant to the requirements of Code of Georgia.
(5) Construction of proposed subdivision. Once the permit to develop has been issued, the developer may proceed with construction of the proposed subdivision in accordance with these regulations.
The developer shall have one year from the date of permit issuance to begin substantial work on the proposed development. If work does not begin within the one year time frame, the proposed plat must be resubmitted to the County Engineer and Planning Commission for approval as if the plat had never been submitted.
If any changes in the development plans of the approved proposed plat are required for any reason, the developer shall submit the proposed changes to the County Engineer prior to construction or implementation of the proposed changes. Approval of the County Engineer shall be required before any changes are constructed. Any changes or deviations from the approved proposed plans prior to the County Engineer's approval shall be in violation of these regulations and shall be subject to removal or correction at the expense of the developer.
Changes to the proposed subdivision construction plans that do not change the overall layout of the subdivision may be reviewed and approved by the County Engineer without the requirement of the construction plans having to be resubmitted for approval by the Planning Commission. Any changes that do change the overall layout (i.e. addition of lots and/or addition of roads) of the subdivision shall require the proposed plat to be resubmitted for approval by the Planning Commission.
(F) Submission of final plat.
(1) Application.
a. No street shall be accepted and maintained by the Unified Government of CussetaChattahoochee County, Georgia nor shall any permit be issued by any department in the Unified Government of Cusseta-Chattahoochee County for the construction of any building or other improvement requiring a permit unless and until a final plat prepared by a licensed and registered land surveyor or of the State of Georgia, has been approved by the Planning Commission.
b. The developer or his agent shall acquire the signatures of the land surveyor or engineer, licensed and registered in the State of Georgia, the owner, or his duly authorized agent, of the tract to be subdivided, and as required herein, the Public Health Inspector before submitting the final plat to the Planning Commission for its review. The Unified Government of Cusseta-Chattahoochee County staff shall obtain the signature of the County Engineer. Six black or blue line prints of the final plat (or a number as specified by the Planning Commission) shall be submitted.
c. The final plat shall conform substantially to the preliminary plat and shall constitute only that portion of the approved preliminary plat which the developer proposes to record and develop at that time.
d. The final plat shall be drawn at a scale no smaller than 100 feet to one inch and shall be drawn on a sheet not less than 81
/2 inches by 11 inches and not larger than 18 inches by 24 inches in width, with a margin on one end of two inches for binding purposes and 1 /2 inch margin on the other three sides. If the final plat is drawn in two or more sections, it shall be accompanied by a key map showing the location of the sections and their relationship to one another.
e. All plats shall conform to the Georgia Plat Act, as amended.
f. Final plats shall be submitted to the County a minimum of 30 days prior to the next regularly scheduled Planning Commission meeting.
(2) Information to be Submitted.
a. The final plat shall show the following information:
1. Name of the owner of the tract to be subdivided.
2. Name of the subdivision.
3. North point, scale, date, and legal land lots and land districts.
4. The names of all adjacent subdivisions and record owners of un-subdivided property adjoining the proposed subdivision.
5. Block and lot numbers in consecutive order. Lots and blocks shall be numbered and continue, without duplication, throughout the subdivision.
6. Total number of lots, the acreage of each lot, acreage of the section being platted and the total number of acres.
7. Lot lines and dimensions with accurate bearings.
8. Location and material of all permanent monuments and lot markers.
9. All areas to which title is reserved by owner.
10. The location of all watercourses, streams, creeks, or wetlands adjoining or within the proposed subdivision.
11. Easements for utilities and limitations on such easements.
12. Subdivision, and weather such streets are public or private, names and accurate locations of all existing and proposed streets within or immediately adjoining the proposed subdivision.
13. Accurate dimensions and bearings of all street lines.
14. Accurate distances and directions to the nearest street corner or official monument.
Reference corners shall be accurately described on the plat.
15. Complete data for all horizontal curves included in the plat, including radius, delta angle, and tangent.
16. Flood: Areas of Special Flood Hazard with Base Flood Elevations and the benchmark for determination.
17. Location of Existing Streets, R.O.W. and public utilities and drainage structures.
18. Name, signature, seal of registered surveyor.
b. All dimensions shall be measured to the nearest 1 /100 of a foot and angles to the nearest minute.
(3) Final Plat Approval.
a. Before acting on the final plat, the Planning Commission may request reports from any person or agency directly affected by the proposed development. At a minimum, the Planning Commission shall obtain from the County Engineer a signed statement that the proposed street names (except in the case of extension of existing streets) do not duplicate the names of streets now in
APPENDIX B—SUBDIVISION REGULATIONS Sec. 3, (F)
existence. Such reports shall certify compliance with or note deviations from the approved preliminary plat and requirements of these regulations. The Planning Commission shall be responsible for securing said reports.
b. A final plat shall be submitted to the County Engineer for approval of the proposed subdivision after:
1. All infrastructure construction or required improvements are complete for a subdivision;
2. An acceptable surety is provided to the County as detailed in Section 3(4) to cover the expense of the required infrastructure/improvements. The amount of the surety shall be as detailed herein for roads seeking County acceptance.
At the point that the final plat is submitted for approval, the developer shall remit and submit each of the following:
(1) All testing and inspection charges required, if any, under Section 5 of these regulations
(2) A final as-built set of plans or certification from the owner's engineer that there were no changes to the approved construction plans;
(3) One copy of the Final Plat as approved by the County Engineer prepared on a suitable permanent reproducible mylar; to include all necessary signatures except the County Engineer, County Commission Chairman, and Clerk of Superior Court;
(4) A letter from the Health Department detailing field review for the general lot layout has been completed;
(5) A digital copy of the plat in an acceptable format as deemed by the Unified Government of Cusseta-Chattahoochee County Revenue Commissioner.
c. The following certifications shall be shown on the final plat:
1. Pursuant to the Subdivision Regulations of the Unified Government of CussetaChattahoochee County, Georgia, all requirements of approval having been fulfilled, this final plat was given final approval by the Planning Commission on , 20 .
This plat is approved for recording in the office of the Clerk of the Superior Court of the Unified Government of Cusseta-Chattahoochee County, Georgia.
Chairman, Unified Government of Cusseta-Chattahoochee County Planning Commission Secretary, Unified Government of Cusseta-Chattahoochee County Planning Commission
2. Streets and storm drainage design, construction plans, and easements meet the requirements of the Board of Commission of the Unified Government of Cusseta-Chattahoochee County, Georgia, and are approved by the County Engineer of the Unified Government of Cusseta-Chattahoochee County, Georgia on , 20 .
By:
County Engineer
3. Certification, with seal, by a Land Surveyor or Engineer, licensed and registered in the State of Georgia to the effect that the survey and plat are correct and in accordance with the Subdivision Regulations and Plat Law.
"In my opinion, this is a correct representation of the land platted and has been prepared to conformity with the minimum standards and requirements of the law." On ,
20 .
By:
Georgia Registration Number:
4. Owner's Certification.
"The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, certifies that this plat was made from an actual survey."
Agent: Owner:
Date: Date:
5. Certificate of approval by the West Central Georgia District (when on-site water supply or sewage disposal systems are to be utilized).
"Requirements for use of on-lot sewage disposal and/or water systems have been fulfilled.
Each lot and system is subject to approval prior to development/ construction."
By:
West Central Georgia Health District Inspector Date:
(4) Acceptance of Improvements and Requirements for Performance Bond or Certified Check.
a. Before the plat is signed by the Chairman of the Planning Commission, all applicants shall be required to complete all improvements as required by these regulations.
b. If the developer does not wish to construct and install required public improvements as described herein prior to submitting the subdivision plat to the Planning Commission for final approval, a performance bond shall be required. Such bond shall be 150 percent the estimated cost of construction of the incomplete improvements. A certified check may be placed in escrow with the Unified Government of Cusseta-Chattahoochee County in lieu of bonds.
c. The performance bond shall comply with all statutory requirements and shall be satisfactory to the County Attorney as to form sufficiency and manner of execution as set forth in these regulations. The period within which the required improvements must be completed shall be incorporated in the bond and shall not, in any event, exceed three years from date of final plat approval.
d. A performance bond shall be required for approval by the Planning Commission. The Performance Bond shall be the equivalent of five percent of the construction costs determined by the County Engineer, which shall remain in escrow for a period of two years to cover compliance against failure.
(5) Filing of Final Plat by Clerk of Superior Court.
a. The final plat shall be properly signed and executed as required by these regulations before it is recorded by the Clerk of the Superior Court of the Unified Government of Cusseta-Chattahoochee County, Georgia.
b. Certificate of Approval for Recording on the Final Plat is as stated in Section 3(c)(1) of these Regulations.
APPENDIX B—SUBDIVISION REGULATIONS Sec. 3, (F)
c. When the approved plat has been recorded, three copies of the plat with the restrictive covenants, if any, shall be furnished by the developer to the Planning Commission staff for distribution to the appropriate departments of the County.
(6) Replat or Resubdivision of Existing Subdivisions of Record. The replatting or resubdivision of land shall follow the procedures, rules and regulations required by this ordinance.