A. Weather limitations. Bituminous prime shall not be applied on a wet surface nor when the temperature of the air is below 40 degrees F in the shade. Prime shall not be applied when rain threatens nor when weather conditions would prevent proper construction of prime coat.
B. Condition of surface. The surface to which the prime is to be applied shall be finished
to the line, grades and cross-section specified. The surface shall be uniformly compact and bonded. All irregularities occurring in the surface shall be corrected in accordance with the specifications for the
particular construction being primed.
1. Cleaning. All loose material, dust, caked clay and all other material likely to prevent bonding of the prime with the surface shall be swept and blown from the road to the full width of the prime and two feet more on each side, with power sweepers and blowers and, where necessary, by hand.
2. Moisture. The surface shall be only slightly damp. If it is too wet, it shall be allowed to dry. If it is too dry, the engineer may require that it be sprinkled lightly, just before it is primed.
C. Temperature and surface texture. The surface texture and condition of the surface govern the choice of the grades of bituminous material to be used.
The following table shows the grades and temperature of application of bituminous materials as they are applied to various surface textures.
_________________________________________________________________________________________________
TEXTURE OF BASE FOR VARIOUS TYPES AND GRADES OF PRIME AND TEMPERATURES OF
APPLICATION
Texture of Base Tight Average Open Tight Open ALL ALL Materials and
Grade MC-30 RC-30 RC-70 or MC-70 RC-250 or MC-250
RT-2 RT-3 CBAE EAP-1
Temperature of Application Degrees F 80 to 120 105 to 180 145 to 220 80 to 120 90 to 140 120 to 160 80 to 150 _________________________________________________________________________________________________
D. Amount and extent of prime. The exact amount of bituminous material to be used will be determined by the engineer within the minimum and maximum rates of 0.15 to 0.30 gallons per square yard.
When the amount to be used has been determined, the contractor shall apply it uniformly and accurately. The amount applied to any one-half mile shall be within five percent of that specified. The prime shall be applied to the full width of the proposed wearing surface which is to be superimposed plus six inches on each side.
E. Heating and applying bituminous prime.
1. Temperature. The exact temperature for applying bituminous prime will be determined by the engineer, within the limits shown.
2. Methods. The heating and applying bituminous materials shall be done as specified.
F. Protection, curing and maintenance.
1. Closing to traffic. The primed surface shall be closed to all traffic and left undisturbed for so long as necessary for the prime to thoroughly cure and until it does not pick up under
traffic.
2. Rolling. If the surface becomes soft after it is primed, the surface shall be rolled longitudinally with a pneumatic-tired roller at not more than six miles per hour until the whole
surface is firmly set.
3. Blotting. If necessary to prevent the prime from being picked up, clean, dry, sharp sand shall be spread by hand or mechanically over the surface. Sand shall only be applied to places that are tacky, and the amount
shall be the least needed to prevent picking up. No extra payment for this work or material will be made.
4. Opening to traffic. After rolling and sanding (if it is required) have been done, the primed surface may be opened to ordinary traffic, subject to conditions stated in paragraph 1 above.
5. Maintenance. The contractor shall maintain the prime coat and the surface of the course primed until it is covered by other construction. All excess bituminous material shall be removed.
Sec. 12. Bituminous tack coat.