Appendix C - ROADWAY AND SUBDIVISION SPECIFICATIONS

Appendix C. ROADWAY AND SUBDIVISION SPECIFICATIONS

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

[ARTICLE I.] GENERAL PROVISIONS

[Sec. 1. Purposes; submission of construction plans.]

A. Purposes. These regulations are adopted for the following purposes:

(1) To protect and provide for the public health, safety, and general welfare;

(2) To encourage the development of economically sound and stable communities;

(3) To assure the provision of required roadways, utilities, and other facilities and services to land developments;

(4) To assure the adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian, in land developments;

B. Submission of construction plans.

(1) The developer or his agent shall submit two black or blue line prints (or a number as specified by the county commission) of construction plans as outlined below.

(2) Detailed construction plans shall be prepared by an engineer registered and licensed in the State of Georgia and shall be prepared in accordance with the design

specification set forth in these regulations.

(3) Construction plans shall, as a minimum, consist of the following:

a. A topographic map drawn at two foot intervals showing existing and proposed contours;

b. Layout plans and centerline profiles for each proposed street or street extension;

c. Layout and profiles of storm drain pipes and structures along with information on any adjacent property such as, but nor limited to, topography and structures which might affect the design of the aforementioned utilities;

d. Design specifications for any bridges or culverts which might be incorporated in the proposed subdivision;

e. Complete curve data for all horizontal and vertical curves. To include delta angle, radius, tangent and P.C.

and P.T. stations for horizontal curves;

and length of curve, tangent grades, PVC and PVT stations for vertical;

and

f. The design speed used in computing curve data for subdivisions is 30 mph.

g. The design speed for collector streets is 45 mph.

h. The design speed for major arterial streets is 55 mph.

i. Hydrology and Hydraulic report of pre-construction and post-construction development for the entire site is required.

j. Soil Erosion and Sediment Control plan for the disturbed area portions of the site.

k. Clearing and grubbing limits.

l. Standard details for construction (Structures, Drainage, Roadway, etc.).

[ARTICLE II.] GENERAL REQUIREMENTS

AND MINIMUM STANDARDS OF DESIGN

AND CONSTRUCTION

[Sec. 1. Street design standards; easements;

drainage, etc.]

A. General requirements.

(1) Suitability of the land. Land shall not be platted for residential occupancy, nor for such other uses as may increase danger to health, life or property, or aggravate a flood hazard as defined in the flood plain map.

(2) Specifications for required improvements.

All improvements, as are required herein, shall be constructed or installed to conform with design specifications of the county.

(3) Continuation of adjoining street system.

The proposed street layout shall be coordinated with the street system of the surrounding area, with the topography,

with such natural features as streams and tree growth, with public convenience and safety, and with the proposed use of the land to be served by such streets.

(4) Access to adjacent properties. Where, in the opinion of the county, it is desirable to provide for access to an adjoining property, proposed roadways shall be extended by dedication to the boundary of such

property and joined with the existing roadways, where such exists, or with other proposed roadways. Where no roadway

exists or where the adjoining property is in alignment with a proposed roadway, a temporary turnaround shall be provided at the boundary of said property.

B. Street design standards. The design standards which shall apply to roadways are as follows:

(1) Right-of-way widths. Minimum right-ofway widths shall be as follows:

Arterial 120 feet Collector 80 feet Subdivision 60 feet

(2) Pavement widths. Pavement widths plus curb and gutter widths (when applicable) shall be not less than the following

a. Arterial:

w/ curb and gutter 53 feet (back to back of curb) w/out curb and gutter 24 feet (w/12 ft shoulder)

b. Collector:

w/ curb and gutter 45 feet (back to back of curb) w/out curb and gutter 24 feet (w/10 ft shoulder)

c. Subdivision streets:

w/ curb and gutter 31 feet (back to back of curb) w/out curb and gutter 24 feet (w/10 ft shoulder)

d. Base thickness: Six inches minimum residential, all others by design

e. Pavement thickness: Two inches minimum residential, all others by design

(3) Grades.

a. Roadway grades shall not be more than 12 percent nor less than 0.5 percent, unless approved by the county.

b. Grades approaching intersections may not exceed eight percent for a distance of not less than 100 feet from the centerline of said intersection unless otherwise approved by the county.

(4) Horizontal curves. Where a centerline deflection angle of more than five degrees occurs, a circular curve shall be introduced, having a centerline radius of not less than the following:

Arterial roadways 500 feet Collector roadways 350 feet Subdivision roads 150 feet

(5) Vertical curves. All vertical curves shall have such length as necessary to provide safe stopping sight distance. The stopping sight distance shall be specified as a line of sight measured along the centerline from a point 3.75 feet above the surface of the pavement to a fixed object six inches in height. The following distances are examples of various speeds. For speeds not shown, calculate the stopping sight distance using formulas recommended by the Institute for Traffic Engineers (ITE).

Design Speed Stopping Sight Distance 20 mph 150 feet 30 mph 200 feet 40 mph 275 feet 50 mph 350 feet

(6) Tangents. There shall be a tangent of at least 100 feet between reverse curves, unless otherwise approved by the county.

(7) Intersections. Roadway intersections shall be laid out as follows:

a. Roadways shall intersect as nearly as possible at right angles, and no street intersect at less than 60 degree.

b. Intersections with arterial roadways shall be at least 800 feet apart measured from centerline to centerline.

c. Street jogs shall not be less than 125 feet measured from centerline to centerline.

d. Proper sight lines shall be provided and maintained at all intersections.

Measured along the centerline, 3.75 feet above grade, there shall be a clear sight distance triangle of 300 feet on major arterials 200 feet on collector roadways, and 100 feet on subdivision roadways, measured from a point of the centerlines intersection.

(B)[(8)] Temporary turn-around. A temporary turn-around, 40 feet in radius, shall be where the logical extension of a subdivision roadway is terminated.

C. Easements. Utility and other easements shall be provided as follows:

1) When the county deems it necessary, utility easements shall be provided. All easements shall be a minimum of ten feet in width. All easements accepted by the

county for utility construction shall be cleared, grubbed and graded by the subdivision developer.

Prior to installation of waterlines, a developer will be required to provide the county with a layout plan and specifications for construction utilizing an accepted waterline easement plan. During construction, it will be necessary for the

county to make periodic inspections and to observe the pressure testing when water is placed in the lines. Following all approved inspections, specifications regarding materials and tests, the county will accept the water mains for maintenance and will operate in accordance with the rights granted in the respective water

line easements.

The developer will provide to the county's attorney an acceptable title opinion to easement property.

2) Where a subdivision is traversed by a natural or manmade watercourse, drainageway, channel, or stream, or a stormwater easement or drainage rightof-way conforming substantially to the lines of such watercourses, drainageway,

channel, or stream shall be provided as determined by the county.

D. Storm drainage.

(1) Storm drainage shall be designed for 25 year return frequency storms. Detention ponds shall be designed for the 100 year return frequency.

(2) Every subdivision shall be served by storm drainage facilities, including drains, sewers, catch basins, culverts and other facilities as required by standards and specifications of the county.

(3) Drainage facilities shall be located in the road right-of-way where feasible, or in perpetual unobstructed easement of appropriate width.

(4) Use of catch basins at road intersections are specified and shall be arranged in such a manner that will not permit water to cross intersections. Unless otherwise specified by the county, cross drainage of roadways or intersections via valley gutter is prohibited.

E. Water supply.

(1) When, in the written opinion of the Georgia Department of Natural Resources through the local health department and

the county water works, public water supply is within a reasonable distance, the subdivider shall install or have installed a

system of water mains and connect to such supply. The installation shall be prior to the paving of the street. The public water supply shall be installed by the county public works department, but at the developer's cost.

(2) Where a public water supply is not available, each lot in a subdivision shall be furnished with a water supply system

acceptable to and approved by the Georgia Department of Natural Resources through the local health department.

F. Inspection during construction. The contractor shall provide all testing designated by the county. All construction performed under the auspices of these regulations shall be subject to inspection by the county. The contractor shall be

responsible for notifying the county in writing prior to commencement of any such work. If the contractor fails to make this notification, he shall then be responsible for the expense of any operation or laboratory testing by the county to ascertain compliance with specifications.

G. Acceptance of improvements. The county shall have the authority to reject any material or work which does not meet the requirements of specifications adopted by the county.

H. Guarantee of work. The developer shall guarantee all work performed by him or his agent against failure for a period of two years after completion of work. To insure compliance with the above, a maintenance bond in an amount determined by the county shall be posted.

I. Specification note. These specifications refer to "contractor and developer". In these specifications, they are interchangeable and/or one in the same. The engineer or inspector is any agent or

individual so designated by the chairman of the county commission.

J. Additional requirement. The subdivision developer shall be required to secure necessary permits for connecting new subdivision construction to existing federal, state, and county highways. The developer will construct all approaches, acceleration/deceleration lanes, drainage, and pavement in accordance with approved plans and permits. The developer will be required to provide

the county with a letter of approval of the connection to existing highway. Also, the developer is required to meet all specifications and requirements of the U.S. Soil and Water Conservation Service and the Georgia Department of Natural

Resources.

K. Construction specifications.

(1) After the effective date of these regulations, the county will not accept any dedicated improvements until the improvements have been completed by the subdivider of the subdivision in conformance with construction plans approved by the county in accordance with these regulations.

[ARTICLE III. SPECIFIC CONSTRUCTION

SPECIFICATIONS]

Specific construction specifications are described in the following section 1 through section 31:

Sec. 1. Temporary silt fence.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cusseta-chattahoochee/zoning/appendix-c-appendix-c-3@2026-11-11-cae595ac17

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cusseta-Chattahoochee County unified government Zoning Ordinance, Appendix C (no. 3 so numbered). ROADWAY AND SUBDIVISION SPECIFICATIONS | Georgia Commons