Dacula · Ordenanza de zonificación
Article XIX - GROUNDWATER RECHARGE PROTECTION DISTRICTS
Section 1904. Minimum lot Sizes and Septic Systems.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-25
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The minimum lot size for lots to be developed with a new septic tank system shall be established by the State of Georgia Department of Human Resources, DHR Manual for On-Site Sewerage Management Systems. Single family homes and mobile homes shall meet the requirements for a single family home. The minimum lot size for a septic tank, adopted by the Gwinnett County Board of Health on December 11, 2000 is 25,500 square feet where a public water system is available within Gwinnett County. Lot sizes shall be increased to one hundred and ten per cent (110%) of the minimum lot area, or 28,050 square feet where the pollution susceptibility is shown as Alow pollution susceptibility on Georgia Pollution Susceptibility Map, Hydrologic Atlas 20, 1992 edition which indicates significant groundwater recharge areas.
No construction may proceed on a building or mobile home to be served by a septic tank unless Gwinnett County Health Department, Environmental Health Section, first approves the proposed septic tank installation as meeting the requirements of the State of Georgia Department of Human Resources DHR Manual for On-Site Sewerage Management Systems. The Gwinnett County Health Department has adhered to said manual since 1985.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.