Sec. 20-1903. Building permits.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Except as hereinafter provided, a building permit issued by the building inspector is required in advance of the initiation of construction, erection, moving or alteration of any buildings or structure or for the development of land for a use which does not require a structure.

1. Application for a building permit. except as hereinafter provided, any owner, authorized agent, or contractor who desires to construct, erect, move or alter any building or structure, or to develop land for a use not requiring a building or structure, shall first make application to the city administrator to obtain the required building permit therefor.

a. Form. Each application for a building permit shall be filed with the zoning administrator on a form

furnished by her and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or his authorized agent.

b. Information. Each application for a building permit shall indicate the proposed occupancy of all parts of the building, structure, or tract of land, and shall contain such information as may be required by the city administrator and building inspector.

c. Plat or plan. All applications for a building permit shall be accompanied by a plat or plan in duplicate, drawn to scale, which shows the actual dimensions of the lot to be developed;

the size and location of buildings and structures to be erected; the setback of any building and structures from front, side, and rear property lines; the use of adjoining properties; the setback lines of buildings and structures, if any, on adjoining properties; and such other information as may be essential to

determine whether or not the provisions of this ordinance are being observed. All plats or plans shall

bear the signature of the owner or agent.

d. Approval of county health department. When a proposed development is to be served by wells, or by septic tanks, or by a private water

system and/or a private sewage disposal system, then the applicant for a permit for such development shall submit with his application for a permit a certificate from the county health department approving such water system, waste disposal system, septic tank, or well.

If city water or sewer is available, it is required to be utilized instead of septic tanks or wells.

2. Issuance of a building permit. If the building inspector is satisfied with [that] the work described in the application for the permit and by the drawing filed therewith conform to the requirements of this ordinance, and if proper certification has been obtained from the county building and health department approving the proposed development, then the zoning

administrator shall issue a building permit for such development to the applicant, along with a signed copy of the plat or plan.

3. Building permit denied. If the application for a permit and the plat or plan filed therewith, describes work which

does not conform to the requirements of this ordinance, or the building codes, or if the health department recommends that a permit be denied for reasons of public health, then the building inspector shall not issue a permit. In such case, the building inspector shall return the plat or plan to the applicant showing his refusal to issue a permit. Such refusal shall state the reasons therefor, and shall cite the particular chapter and section of this ordinance with which the application does not comply.

4. Conditions of the permit. A building permit which has been issued shall be construed to be authority to proceed with the work and shall not be construed as authority to violate, cancel, alter or set aside any provision of this ordinance, nor shall such issuance of a permit prevent the building inspector from thereafter requiring a correction of errors in plans or in construction or development which violates this ordinance. Any building permit issued shall become invalid unless the

work authorized by it shall have commenced within six months of its issuance, or if the work or development authorized

by such permit is suspended or abandoned for a period of six months after the work or development is commenced; provided that extensions of time for periods not exceeding six months each may be

allowed in writing by the building inspector.

5. Building permit not required. A building permit shall not be required for the construction, erection, alteration, or moving of any structure established in connection

with agricultural, forestry, or fishery activities, or in connection with the development of land for any such purposes in any district in which such activities are permitted and constitute the principal use, individually or collectively, of a tract or

plot ground.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1998, § 20-1903)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:darien/zoning/20-1903@2026-11-11-61efdf08e4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Darien Zoning Ordinance, Sec. 20-1903. Building permits | Georgia Commons