Appendix A - ZONING / Article XXXVI - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, PENALTIES AND REMEDIES

Sec. 3604. Building permit required.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

No building, structure or sign, except as specifically exempted by these regulations, shall be erected, moved, extended, enlarged or structurally altered, nor shall any excavation or filling of any lot for the construction of any building be commenced until the planning director or designee has issued a building permit for such work in conformity with the provisions of these regulations. Building permit fees shall be as set forth in the city fee schedule.

All building permits shall be issued by the planning director or designee. In cases of uncertainty regarding whether a proposed building or structure conforms to any provisions within this ordinance and the City Development Regulations, the planning director or designee shall consult with the city engineer for his interpretation and ruling. Building permits shall become invalid unless the work authorized by it shall have been commenced within 90 days of date of issuance, or if the work authorized by it is suspended or abandoned for a period of six months or more, or if the work authorized by it is not completed within 18 months of date of issuance. Permits may be reinstated up to two separate six-month extensions. Prior to reinstating a permit, the planning director shall determine if a new plan review and plan revision is required.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-3-2018; Ord. No. 03-2021, § 1, 10-18-2021)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dawsonville/zoning/3604@2026-11-11-c27e19dbb0

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dawsonville Zoning Ordinance, Sec. 3604. Building permit required | Georgia Commons