Dunwoody · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 16 - LAND DEVELOPMENT REGULATIONS / Article II - ENVIRONMENT AND NATURAL RESOURCES / Division 5 - STORMWATER MANAGEMENT
Sec. 16-92. Pre-submitted meeting, stormwater concept plan, and stormwater management plan requirements.
Sobre este texto
- As published by Municode, current through 2020-02-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Before a land development permit application is submitted, an applicant shall request a pre-submittal meeting with the City of Dunwoody.
The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and inventory (GSMM section 2.4.2.4) or the stormwater concept plan (GSMM section 2.3.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the
stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans,
and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the City of Dunwoody when applying for a determination of infeasibility through the practicability policy.
(b) The stormwater concept plan shall be prepared using the minimum following steps:
(1) Develop the site layout using better site design techniques, as applicable (GSMM section 2.3).
(2) Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/reduction, channel protection, overbank flooding protection and extreme flooding
protection (GSMM section 2.2).
(3) Perform screening and preliminary selection of appropriate best management practices and identification of potential
siting locations (GSMM section 4.1).
(c) The stormwater concept plan shall contain:
(1) Common address and legal description of site;
(2) Vicinity map; and
(3) Existing conditions and proposed site layout mapping and plans (recommended scale of 1"=50'), which illustrate at a minimum:
a. Existing and proposed topography (minimum of 2-foot contours).;
b. Perennial and intermittent streams.
c. Mapping of predominant soils from USDA soil surveys.
d. Boundaries of existing predominant vegetation and proposed limits of clearing and grading.
e. Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream
buffers and other setbacks (e.g.
drinking water well setbacks, septic setbacks, etc.)
f. Location of existing and proposed roads, buildings, parking areas and other impervious surfaces.
g. Existing and proposed utilities (e.g.
water, sewer, gas, electric) and easements.
h. Preliminary estimates of unified criteria requirements.
i. Preliminary selection and location, size and limits of disturbance of proposed BMPs.
j. Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains.
k. Flow paths.
l. Location of the boundaries of the base flood floodplain, future-conditions floodplain, and the floodway (as applicable) and relationship of
site to upstream and downstream properties and drainage, and
m. Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings.
(d) The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered professional engineer (PE)
or a registered landscape architect licensed in the State of Georgia. Items (3), (4), (5) and (6) shall be sealed and signed by a registered PE licensed in the State of Georgia. The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose (GSMM section 2.4.2.7).
(1) Natural resource inventory.
(2) Stormwater concept plan.
(3) Existing conditions hydrologic analysis.
(4) Post-development hydrologic analysis.
(5) Stormwater management system.
(6) Downstream analysis.
(7) Erosion and sedimentation control plan.
(8) BPM landscaping plan.
(9) Inspection and maintenance agreement.
(10) Evidence of acquisition of applicable local and non-local permits.
(11) Determination of infeasibility (if applicable).
(e) For redevelopment sites, predevelopment conditions must be modeled using the established guidelines for the portion of the site
undergoing land development activities. For re- development and to the extent existing stormwater management structures are being used to meet stormwater management standards, the following must also be included in the stormwater management plan for existing
stormwater management structures:
(1) As-built drawings.
(2) Hydrology reports.
(3) Current inspection of existing stormwater management structures with deficiencies noted.
(4) BMP Landscaping Plan.
Historia
(Ord. No. 2020-11-21, § I, 11-30-2020)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.