Dunwoody · Ordenanza de zonificación
Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article IV - SEWERS AND SEWAGE DISPOSAL / Division 2 - SEWER CONSTRUCTION AND ASSESSMENTS
Sec. 32-217. Sanitary sewer main extensions.
Sobre este texto
- As published by Municode, current through 2020-02-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The county sanitary sewer main extension policy shall apply to the extension or replacement of existing sanitary sewer mains on existing city roads or other dedicated rights-ofway to serve new developments. The city hereby adopts the county sanitary sewer main extension policy by reference as it currently exists and as it may be amended in the future. A developer
may request the application of this policy if a project site is not adjacent to an existing main or the existing main is inadequate to serve the proposed development.
(b) The developer may apply for preapproval of the sewer main extension application with the understanding that such reimbursement shall be made only after the developer has complied with all the requirements of this section. Conversely, the developer may apply for reimbursement after complying with all the requirements of this section and such reimbursement shall be
made on approved applications if funds are available for that purpose. Approval of all application requests shall be within the sole discretion of the county or, if designated by agreement, the city.
(c) Sanitary sewer mains approved and installed under this section shall be subject to the following conditions:
(1) All materials shall meet the specifications of the county department of watershed management.
(2) A sanitary sewer main design shall be prepared by and furnished to the county or, if designated by agreement, the city by a registered professional engineer licensed by the state.
(3) The developer shall contract for the installation of the sewer lines and shall furnish the county and the city a copy of
the contract. When the work has been completed according to the specifications and duly inspected by the county or its designee, the developer shall provide
as-built drawings and any required easements of the sewer main installation to the county and the city. As-built drawings
shall be completed under the direction of an engineer/land surveyor licensed in the state and sealed.
(4) After the work has been completed and inspected to the satisfaction of the county and, if designated, the city, the developer shall provide a maintenance bond equal to ten percent of the costs of the
construction of such facilities. The developer may provide a letter of escrow or letter of credit acceptable to the county
and the city in lieu of the maintenance bond required in this section.
(5) After receiving the maintenance bond, letter of escrow or letter of credit, the county shall reimburse the developer a sum equivalent to 50 percent of the cost of the sewer main materials required to supply the proposed development. An eight-inch main will be considered as the minimum size main required to supply a development of any size. In the event the county's plans for future sewer service call for a sewer main to be installed larger than the size of the main required
to supply the development, then the county may:
a. If the size of sewer main planned by the county is 15 inches or smaller, pay the difference in cost of the materials to install the size main required by the county plans.
b. If the size of sewer main planned by the county is greater than 15 inches, pay the difference in both the cost of labor and materials to install the size main required by the county plans.
(6) The developer shall be required to maintain the sanitary sewer lines for a period of 12 months. During this developer maintenance period, the county, or its designee shall make inspections and instruct the developer by letter as to what corrections must be made, if any.
(7) At the end of the 12-month developer maintenance period, the county and the city shall make a final inspection and notify the developer and the bonding company, if any, of any corrections to be made. If the work is acceptable at this time, the maintenance bond, letter of escrow or letter of credit shall be released pursuant to the county policy.
(8) If required corrections are not made within 30 days of notice, the county shall have the authority to make these corrections at the expense of the bonding company. In cases where funds are being held under letter of credit or letter of
escrow, the cost of making these corrections shall be drawn by the county from these funds, and the developer charged
with any costs above the amount of such funds.
(9) The county shall have the full authority to inspect and test all sanitary sewer mains installed under this section.
(10) No use shall be made of such systems nor shall the county, or the city, accept such systems until the developer has complied with all the requirements of this section and until satisfactory tests and inspections have been completed.
(11) In calculating the county participation for material costs, the maximum material costs considered will be the county's contract price for like material.
(d) Private sanitary sewer extensions will not be accepted for maintenance by the county unless materials used for installation are inspected and approved by the county prior to construction and are found to meet the county
specifications and unless the installation was inspected by the county during construction.
Historia
(Comp. Ords. 2008, ch. 25, art. III, div. 2, § 2)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.