Sec. 32-293. Reporting requirements.

Sobre este texto

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Baseline monitoring reports.

(1) Compliance date report. Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing

categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the information listed in subsection (a)(2) of this section. At least 90 days prior to commencement of their

discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report which contains the

information in subsection (a)(2) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants to be discharged.

(2) User to submit certain information. Users described above shall submit the following information:

a. Identifying information. The name and address of the facility including the name of the operator and owner.

b. Environmental permits. A list of any environmental control permits held by or for the facility.

c. Description of operations. A brief description of the nature, average rate of production and standard industrial classifications of the operations carried out by the user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated process.

d. Flow measurement. The measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams.

e. Measurement of pollutants.

1. The categorical pretreatment standards applicable to each regulated process.

2. The results of sampling and analyses identifying the nature and concentration of regulated pollutants in the discharge from each regulated process. Instantaneous, daily

maximum, and long-term average concentrations shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 32-333.

3. Sampling must be performed in accordance with procedures set out in section 32-333.

f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether

pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or adUTILITIES § 32-293 ditional pretreatment is required to meet the pretreatment standards and requirements.

g. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional treatment. The completion date in this schedule shall not be later than the compliance date

established for the applicable pretreatment standard.

h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 32-294.

(b) Compliance schedule progress reports.

The following conditions shall apply to the compliance schedule required by subsection (a)(2)g of this section:

(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards.

(2) No increment referred to above shall exceed nine months.

(3) The user shall submit a progress report to the director no later than 14 days following each date in the compliance schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of

progress, the reason for any delay and, if appropriate, the steps being taken by the user to return to the established schedule.

(4) All compliance schedule progress reports must be signed and certified in accordance with section 32-294.

(5) In no event shall more than nine months elapse between such progress reports to the director.

(c) Report on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source, following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment

standards and requirements shall submit to the director a report containing the following information: flow measurements; measurement of pollutants; and the certification statement, as

described in subsection (b) of this section, the baseline monitoring report. All compliance reports must be signed and certified in accordance with section 32-293.

(d) Discharge monitoring reports (self-monitoring reports). All significant industrial users shall, at a frequency determined by the director

and specified in the wastewater discharge permit but in no case less than twice per year, submit a report on the nature and concentration

of pollutants in the discharge which are limited by pretreatment standards, and the measured daily flows for the reporting period. All discharge monitoring reports must be signed and certified in accordance with section 32-294.

(1) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated and

maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.

(2) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the director, using the procedures prescribed

in this division, the results of the additional monitoring shall be included in the report.

(e) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the director's designee as identified in the wastewater discharge permit within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analyses and submit

the results of the repeated testing to the director within 30 days of becoming aware of the violation. The user is not required to resample if the department monitors the user's facility at least

once a month, or if the department samples between the user's initial sampling and when the user receives the results of that sampling.

(f) Reports of changed conditions. Each user must notify the director of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume

of its wastewater at least 60 days before the change.

(1) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 32-288.

(2) The director may issue a wastewater discharge permit as defined in section 32-183 or modify an existing wastewater discharge permit in response to changed conditions or anticipated changed conditions.

(3) For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Comp. Ords. 2008, ch. 25, art. III, div. 4, § 6)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dunwoody/zoning/32-293@2020-02-10-c04beb486a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dunwoody Zoning Ordinance, Sec. 32-293. Reporting requirements | Georgia Commons