Ir al contenido
Georgia Commons
Menú

Dunwoody · Ordenanza de zonificación

Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article V - STORMWATER UTILITY

Sec. 32-502. Findings.

Sobre este texto

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The mayor and city council makes the following findings of fact:

(1) The city is authorized by the supplementary powers provisions of Ga. Const. art.

IX, § II, ¶ III(a)(6) to provide a stormwater collection and disposal system throughout the city.

(2) The federal Clean Water Act as amended by the Water Quality Act of 1987 (33 USC 1251 et seq.) and rules promulgated by the United States Environmental Protection Agency pursuant to the act emphasizes the role of local governments in developing, implementing, conducting and funding stormwater programs which address water quality and the impact of stormwater runoff.

(3) Given the project cost of stormwater management programs, systems and facilities identified in the professional engineering and financial analyses performed by the county and obtained by the city, it is appropriate to adopt a

stormwater service fee rate methodology and to charge service fees to properties and persons within the city in a manner that recovers the cost of programs, systems and facilities and other

costs associated therewith, including but not limited to allocations of the cost of services provided to the stormwater management utility by other funds of the city and other government entities and agencies, interest on bonds, operational and

emergency reserves, allowances for delinquencies and bad debt, and such other costs as may be deemed reasonable and appropriate by the mayor and city council to ensure the management, maintenance, protection, control, regulation, use and enhancement of stormwater programs, systems and facilities in the city.

(4) The stormwater conditions reflected in the study conducted by the county and obtained by the city reflect the current conditions of the stormwater system in the city.

(5) Stormwater management is applicable and needed throughout the city.

Stormwater service fee rate methodology and service fees should be applicable throughout the city to enable the city to successfully manage operate and improve stormwater programs, systems and

facilities at an advanced level. Service fees will also assist the city in meeting the regulatory obligations imposed by its national pollutant discharge elimination system (NPDES) permits by reducing pollution and increasing water quality within the city.

(6) The stormwater needs in the city include but are not limited to protecting the public health, safety and welfare. Funding of stormwater programs, systems and facilities is therefore incidental to the fundamental regulatory function of the city in protecting the public health, safety

and welfare.

(7) Provision of stormwater management programs, systems and facilities renders and/or results in both services and benefits to individual properties, property owners, citizens and residents of the city and to all properties, property owners, citizens and residents of the city concurrently in a variety of ways as identified in the professional engineering and financial analyses, and the services and benefits differ among the individual properties, property owners, citizens and residents in relation to the

demands they impose individually and collectively on the stormwater systems and facilities.

(8) The services and benefits rendered or resulting from the provision of stormwater management programs, systems and facilities may differ over time depending on many factors and considerations, including but not limited to location, demands and impacts imposed on the stormwater systems and facilities, and

risk exposure. It is not practical to allocate the cost of the city's stormwater management programs, systems and facilities in direct relationship to the services or benefits rendered to or received by individual properties or persons over

a brief span of time, but it is both practical and equitable to allocate the cost of stormwater management among properties and persons in proportion to the

long-term demands they impose on the city's stormwater programs, systems and facilities which render or result in services and benefits.

(9) The city presently owns and operates stormwater management systems and facilities which have been developed, installed and acquired through various mechanisms over many years. The future usefulness and value of the existing stormwater systems and facilities owned and operated by the city, and of future additions and improvements thereto, rests on the ability of the city to effectively manage, protect, control, regulate, use and enhance the stormwater systems and facilities in the city. In order to do so, the city must have adequate and stable funding for its stormwater management program operating and capital investment needs.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Comp. Ords. 2008, ch. 26, § 1)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dunwoody/zoning/32-502@2020-02-10-2acb7822d9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dunwoody Zoning Ordinance, Sec. 32-502. Findings | Georgia Commons