Eastman · Ordenanza de zonificación
Appendix A - ZONING FOREWORD / Article XIII - ADMINISTRATION AND ENFORCEMENT
Sec. 140. Heart of Georgia guidelines for building, construction and permitting.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(A) Any person constructing or altering an existing structure, within the jurisdiction of the City of Eastman and within a three (3) mile radius of the Heart of Georgia Regional Airport must complete and submit to the Federal Aviation Administration (FAA) form 7460-1 prior to submitting a request for permit with the City of Eastman Building Inspector. A copy of the submission and FAA response will be required when applying for a permit.
(B) Any person constructing or altering an existing structure, within the jurisdiction of the City of Eastman and between a three (3) and five (5) mile radius of the Heart of Georgia Regional Airport must complete and submit to the Federal Aviation Administration (FAA) form 7460-1, if the structure will exceed a height of two hundred (200) feet, prior to submitting a request for permit with the City of Eastman Building Inspector. If required to file, a copy of the submission and FAA response will be required when applying for a permit.
(C) Any person constructing or altering an existing structure, within the jurisdiction of the City of Eastman and further than five (5) mile radius of the Heart of Georgia Regional Airport will not be required submit the Federal Aviation Administration (FAA) form 7460-1.
Historia
(Ord. No. 2025-001, §§ 1, 2, 2-10-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.