Effingham County · Ordenanza de zonificación
Appendix TO - ZONING ORDINANCE HOUSING ORDINANCE / Article V - PLANNED MANUFACTURED HOME COMMUNITY
Section 9. Utilities.
Sobre este texto
- As published by Municode, current through 2026-08-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following utilities are required:
9.1 An electrical service supplying 200 amperes of service shall be provided for each dwelling space. All such outlets shall be weather proof, and installations shall meet the requirements of the National Electrical Code.
9.2 An adequate supply of pure, potable water for drinking and domestic purposes shall be supplied by pipes to all buildings and dwelling lots within the planned manufactured home community. Each dwelling stand shall be provided with an approved cold water connection and a tap, constructed in accordance with the plumbing standards adopted by the county.
9.3 Approved fire hydrants with isolation valves shall be located at least every 500 feet and at every intersection or as designated by fire officials of the county. They shall be located and designed in accordance with the National Fire Protection Codes.
9.4 Waste from shower, bathtubs, flush toilets, urinals, lavatories, slop sinks, and laundries in service and other buildings within the planned manufactured home community shall be discharged into a public or private sewer and disposal plant or septic tank system of such construction and in such manner as approved by the Effingham County Health Department or State of Georgia Environmental Protection Division (EPD).
9.5 Each dwelling stand shall be provided with a trapped sewer at least four inches in diameter, which shall be connected to receive the waste from the shower, bathtub, flush toilet, lavatory, and kitchen sink of the manufactured home harbored in such dwelling space. The trapped sewer in each space shall be connected to discharge the dwelling waste into a public sewer system in compliance with applicable ordinances or into a private sewer and disposal plant or septic tank system of such construction and in such manner as approved by the Effingham County Health Department.
9.6 If public water is available within 1,000 feet of the proposed planned manufactured home community, the owner shall connect into the existing public system. If public water becomes available within one thousand feet of an existing manufactured home community, the owner may connect into the system.
9.7 If public sewerage service becomes available to an existing planned manufactured housing community, a revised planned manufactured housing community plan reflecting proposed density increases, layouts, etc. shall be submitted to the planning board and county commission for review and approval prior to obtaining sewerage service. Notwithstanding the availability of public sewerage, the county commission is under no obligation to grant increased density at any community. The county commission reserves the right to require that manufactured and mobile homes using septic tanks connect to public sewerage service when available.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.