A. The department may administratively approve the uses set forth in section 8.108.5 of this division. All such uses shall comply with requirements set forth in this division and all other applicable codes and ordinances.
B. Except as provided in section 8.108.4, the department shall respond to each application within 45 days of its receipt by either approving or denying the application. One 45-day extension of this review period may be exercised by the department if such additional time is deemed necessary to adequately assess the request. If the department fails to respond to the applicant within a maximum of 90 days, the application shall be deemed to be approved.
C. As part of any administrative approval, the department may administratively reduce setback requirements by up to ten percent to compensate for irregularly shaped lots or parcels.
D. Any decision by the department that results in the denial of a request to place, construct, or modify wireless telecommunications facilities shall be in writing and supported by substantial evidence. In addition to the requirements set forth in section 8.108.5 for uses allowed by administrative approval, the department shall consider the applicable factors set forth in section
8.109.5 in acting upon an application for administrative approval.
8.108.2 Application, contents, fee. All applications for administrative approval of a permit shall be submitted to the City of Emerson planning and zoning commission. Each application shall contain as a part thereof detailed plans and specifications as set forth in section 8.107. An application for administrative approval of a permit shall not be accepted for processing without the information required in section 8.107 of this division. An application fee shall be charged by the department.
8.108.3 Co-location of antennas required. Applicants for the erection of a tower of a placement of an antenna shall be required to co-located upon an existing tower or alternative tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area, and that no suitable alternative tower structure is available as set forth in section 8.106.4.
8.108.4 Independent expert review. If, in the opinion of the department, an independent expert review of an application is warranted, the department may engage a licensed professional engineer or other appropriate professional, as an independent expert to review any of the materials submitted by an applicant and render an opinion on any issue relevant to the application, the adequacy of the supporting data, structural integrity and the feasibility of alternative sites or co-location. Upon the review by an independent expert, the department shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. If the applicant is unable to satisfactorily address those concerns, the applicant shall be allowed a reasonable amount of time, not to exceed 30 days, in which to modify the application to alleviate the department's concerns or withdraw the application altogether. The expert's opinion shall be considered determinative, unless the applicant agrees to pay the expenses of submitting both opinions for a peer review, which review shall then be considered final. If the dependent third-party expert supports the applicant's expert, then the department shall pay the expenses of said third-party expert. If the independent third-party expert supports the position of the department, then the applicant shall pay the expenses of said third-party experts. The department shall respond within 30 days following the final review as herein provided. No permit shall be issued until the applicant has paid all expenses incurred under this section.
8.108.5 Uses allowed by administrative approval. The following uses may be approved by the department after conducting an administrative review:
A. If it is adequately demonstrated that antenna co-locations, as required in section 8.108.3 above, is not possible for a given geographic antenna placement area, construction of a new tower up to a height of 150 feet, including the placement of additional buildings or other supporting equipment used in connection with said tower or antenna, may be permitted in the following zoning districts:
a. LI
b. HI Provided, however, that all structures shall meet the setback, screening and buffer requirements contained herein.
B. So long as the addition of said antenna adds no more than ten feet to the height of the existing alternative tower structure:
i. Installation of an antenna on an existing alternative tower structure in any non-residential district; or
ii. Installation of an antenna on an existing county owned alternative tower structure in any non-residential district, provided a lease authorizing the antenna has been approved by the governing authority.
C. So long as the addition of said antenna adds no more than ten feet to the height of the existing tower:
i. Installation of an antenna on an existing tower of any height in any non-residential district, and further including the placement of additional buildings or other supporting equipment used in connection with said antenna; or
ii. Installation of an antenna on an existing tower located on property owned, leased or otherwise controlled by the city in any non-residential district, and further including the placement of additional buildings or other supporting equipment used in connection with said antenna, provided a lease authorizing the tower has been approved by the governing authority.
D. Construction of a new tower up to a height of 150 feet, including the placement of additional buildings or other supporting equipment used in connection with said tower or antenna, if placed upon property owned, leased or otherwise controlled by the city in any non-residential district, providing a lease authorizing the tower has been approved by the governing authority.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.