Ir al contenido
Georgia Commons
Menú

Emerson · Ordenanza de zonificación

Appendix A - ZONING / Article VII - REGULATED USES / Division 10 - RECREATION VEHICLE PARKS

Sec. 8.309. Wastewater facilities.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Each site within the RV park shall be provided with a connection for wastewater if available. If city wastewater is not available, then a permit shall be obtained prior to placement of an on-site sewage facility. All proposed wastewater service lines shall be connected to the city wastewater system if available.

On-site sewage facilities may be permitted if city utilities are not available. The city must approve all proposed wastewater facility plans prior to construction. The wastewater distribution system shall be installed as follows:

1) The wastewater system and materials must be installed in accordance with applicable codes adopted by the city.

2) Each site shall be provided with a four-inch diameter wastewater riser and shall extend above grade four to six inches. The wastewater riser pipe shall be so located on each stand so that the wastewater connection to the RV drain outlet will approximate a vertical position. Each inlet shall be provided with a gastight seal when connected to a recreational vehicle or have a gastight seal plug when not in service. The plug shall be that of a spring-loaded device.

3) The wastewater connection to each site shall consist of a single four-inch service line without any branch lines, fittings, or connections. All joints shall be watertight.

4) Surface drainage shall be diverted away from the riser. The rim of the riser pipe shall extend at least four to six inches above the ground elevation.

5) Each collection wastewater line shall provide a vent extending a minimum of ten feet in height.

6) The owner/operator shall have complete maintenance responsibility for the wastewater system within the RV park. The responsibility of the city stops at the property line.

7) Each RV park shall be required to install at the property line, where connection to the city sewer is made, a sample well site as defined herein. The sample well site shall be installed according to city Code.

8) All chemicals entering the city sewer shall be biodegradable.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:emerson/zoning/8.309@2026-11-11-9f300cadfb

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Emerson Zoning Ordinance, Sec. 8.309. Wastewater facilities | Georgia Commons