Ir al contenido
Georgia Commons
Menú

Fairburn · Ordenanza de zonificación

Part II - LAND DEVELOPMENT AND RELATED REGULATIONS / Chapter 80 - ZONING / Article IV - ADMINISTRATIVE PERMITS AND USE PERMITS

Sec. 80-184. Relocated residential structure.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Allowable districts: R-1, R-2, R-3, R-4, and

R-CT, RM-12.

(b) Standards:

(1) The applicant shall include the following with the application for the administrative permit:

a. The address from which the structure is being relocated.

b. A photograph of the structure prior to its relocation.

c. The total heated floor area of both the existing structure and the renovated structure.

(2) The location of the structure and the heated floor area of the structure shall be in compliance with the minimum

standards of the zoning district and/or conditions of zoning.

(3) The residential structure shall be affixed to a permanent foundation within six

months of the date of the house moving permit, and the certificate of occupancy shall not be issued until such improvements are completed.

(4) All standards of this section (except subsection (b)(2)) and other applicable

regulations shall be met within one-year from the date of this permit issuance.

(5) A house moving permit shall be obtained from the department of planning and

zoning in conjunction with this administrative permit.

(6) A building permit for the repair and construction of said structure shall be

obtained within 30 days of the issuance of the administrative permit.

(7) The exterior of the structure shall be brought into compliance with the city

building regulations within six months of the issuance of this administrative permit.

(8) Prior to occupancy, a certificate of occupancy must be obtained from the

department of planning and zoning.

(Ord. No. 2012-04, § 1(Exh. A), 6-11-2012; Ord.

of 10-28-2019(1))

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:fairburn/zoning/80-184@2026-11-11-270958ff62

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.