Sec. 104-28. Site plans.
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Filing of site plan. The site plan shall be submitted in accordance with the schedule of established application deadlines and meeting dates, a copy of which is available in the planning and zoning department. The site plan shall be deemed filed when it has been submitted to the zoning administrator.
(b) Site plan distribution. Fifteen copies of a 24 inches by 36 inches site plan shall be submitted to the planning and zoning department for distribution and review by the applicable departments.
(c) Site plan contents. The site plan shall:
(1) Be prepared by an engineer of architect registered in the state;
(2) Include a recorded signed and sealed survey indicating metes and bounds;
and
(3) Contain all applicable information as required on the site plan review checklist, a copy of which is available at the planning and zoning department.
(d) Department approval. Upon completion of site plan review by the required departments, each department will return its comments to the planning and zoning department, who will make the appropriate entries on the site plan review checklist and notify applicant of approval, administrative conditions of approval, or additional requirements.
(e) Fee. A site plan review and compliance fee as specified in this Code will be collected and a receipt provided at the time of issuance of the certificate of zoning compliance by the zoning administrator and prior to the issuance of a building permit.
(f) Other plans required. The following plans if applicable shall be submitted at the time of site plan submittal and shall be approved prior to site plan approval:
(1) Floodplain management plan. Reference article IV of this chapter of the development regulations for applicability and plan requirements (two sets).
(2) Landscape plan. Reference article V of this chapter for applicability and plan requirements (two sets).
(3) Tree protection plan. Reference article VI of this chapter for applicability and plan requirements (two sets).
(4) Soil erosion, sedimentation and pollution control plan. Reference article IX of this chapter for applicability and plan requirements (three sets).
(5) Grading plan. Required only when a land disturbance permit is not applicable (two sets).
a. Clearing, grubbing or grading shall not be undertaken until a land disturbance permit has been approved by the environmental management department. If a land disturbance permit is not required, a grading plan shall be approved prior to any clearing, grubbing, or grading.
b. No clearing, grubbing or grading involving the use of explosive may be undertaken until a permit has been issued by the fire marshal.
c. No installation or removal of underground tanks for class I, II, or III flammable liquids shall be undertaken until appropriate permits and inspections have been conducted by the fire marshal.
(6) Water plan. If required by the water system (two sets).
(g) Verification of lot. In addition to an approved site plan, an applicant must provide verification that a plat of subdivision has been approved and recorded if required by article XV of this chapter.
(h) Approval by zoning administrator. Upon approval of the site plan by all the applicable departments, the zoning administrator may approve the certificate of zoning compliance.
(i) Certification of building official and fire marshal. The applicant will be notified by the zoning administrator's issuance of the certificate of zoning compliance that the site plan has been approved. A copy of the certificate of zoning compliance will be presented to the building official and fire marshal.
(j) Building construction plans. Two sets of building construction plans including one set in electronic media format known as a PDF (portable document file) format on a CD/RW shall be submitted to the fire marshal for review and approval by both the fire marshal and building official. Construction plans shall not be submitted to the fire marshal prior to the site plan approval process. Building construction plan documents should include:
(1) One PDF file on CD/RW with project manual PDF (complete set of construction drawings including site plans). Architect/engineer signed/scaled stamp required.
(2) Two complete sets of architectural construction drawings with appropriate architect/engineer signed/sealed stamp. Architectural drawings—floor plans;
elevations; mechanical plans; plumbing plans; fire protection plans—fire extinguishers; alarm; smoke/heat detection; sprinkler plans. Construction type by International Building Code and building square footage should be noted. In addition to the fire marshal's requirements, the permits and inspection department requirements shall include, but not be limited to the following:
a. COM check; use and occupancy classification; occupant load; electrical panels and panel schedules; ARC fault current calculations and interrupt ratings for equipment; electrical load calculations; structural load packages; engineered trust/joist packages; framing details; statement of special inspections; footing/foundation specifications; gas line isometric details; ventilation, outside air, and makeup air schedules; specific hazardous area details; energy code details/specifications.
b. Check with the permits and inspections department for specific details/ requirements for the project.
c. If applicable, two sets of project manuals with specifications.
(k) Site plan changes. Any deviations from an approved site plan must be shown on a revised site plan and approved by the applicable departments. Changes shall be authorized in writing on the revised site plan by the applicable departments. A copy of the revised site plan will then be given to the building official for inclusion in the project file.
(l) Fire marshal approval. The fire marshal shall approve all construction plans and submit to the building official a written report of compliance with chapter 12, fire prevention. Prior to any building construction, the applicant must obtain a construction permit through the bureau of lire prevention.
This permit will not be in lieu of required permits through the building official.
(m) Certificate of occupancy. In no case shall a certificate of occupancy be issued by the building official unless an as-built condition is reflected on an approved site plan.
(n) Expiration of certificate of zoning compliance. If no application is made to obtain a building permit from the building official within 12 months of the date of zoning compliance, then said compliance shall be deemed null and void.
(Code 1992, § 8-27; Ord. No. 1986-13, § 2-1, 7-24-1986; Ord. of 3-24-1988; Ord. No.
1997-08, 4-24-1997; Ord. No. 1998-08; Ord. No. 2001-06, 6-28-2001; Ord. No.
2012-01, § 1, 3-22-2012; Ord. No. 2016-13, § 1, 7-28-2016)