Fayette County · Ordenanza de zonificación
Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article XIV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT
Sec. 104-558. Definitions.
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Administrator means the appointed entity to administer and implement this article on post-construction stormwater management for new development and redevelopment.
Applicant means a person submitting a land development application for approval.
Basin means an area of land that drains to a single outlet and is separated from other basins by a divide (i.e., a watershed).
Best management practices (BMP) means structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the State of Georgia.
BMP landscaping plan means a design for vegetation and landscaping that is critical to the performance and function of the BMP including how the BMP will be stabilized and established.
Channel means a natural or artificial watercourse with a definite bed and banks that conducts flowing water continuously or periodically.
Common plan of development means a contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or scale.
Conservation easement means an agreement between a land owner and the county, other government agency or land trust that legally protects a designated natural conservation area for purposes of better stormwater management site design on the owner's land in perpetuity by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.
Construction sequencing plan means a document noting the sequence of construction and identification of infiltration zones for protection during staged installation of permanent post construction BMPs to ensure suitable site conditions such as avoiding soil compaction by heavy equipment in areas designated for infiltration BMPs.
Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.
Development means new development or redevelopment.
Developer means a person who undertakes land development activities.
Drainage easement means an easement appurtenant attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.
Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme-flood protection means measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more.
Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.
Georgia Stormwater Management Manual (�GSMM�) means a stormwater technical guidance manual, also known as "the Blue Book" published by the Atlanta Regional Commission. The "Georgia Stormwater Management Manual" is hereby incorporated by reference into this article.
Hotspot means a land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff. As defined by the administrator, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the industrial stormwater general permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use.
Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface (excludes porous pavements).
Industrial stormwater general permit means the National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies based on Standard Industrial Classification (SIC) Code.
Infiltration means the process of stormwater runoff percolating into the subsoil.
Inspection and maintenance agreement means a written agreement approved by the county board of commissioners providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.
Jurisdictional wetland means an area that meets the definitional requirements for wetlands as determined by the U.S. Army Corps of Engineers.
Jurisdictional wetlands determination means a delineation of jurisdictional wetland boundaries by the U.S. Army Corps of Engineers, as required by section 404 of the Clean Water Act, 33 USC 1344, as amended.
Land development (development) means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.
Land development application means the application for a land development permit on a form provided by Fayette County along with the supporting documentation required in section 104-561 Land development permit means the authorization necessary to begin construction related, land disturbed activity Land development activities means those actions or activities that comprise, facilitate or result in land development.
Land development project (project) means a discrete land development undertaking.
Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land. Land disturbing activity does not include agricultural practices as described O.C.G.A. § 12-7-17(5) or silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities.
Linear Feasibility Program means the feasibility program developed by Fayette County and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of stormwater management standards for linear transportation projects being constructed by Fayette County is infeasible.
Linear Transportation Projects means construction projects on traveled ways including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways.
MS4 Permit means the NPDES permit issued by Georgia Environmental Protection Division for discharges from the Fayette County's municipal separate storm sewer system.
Natural conservation area means a legally protected area of the site that is perpetually preserved in a natural state thereby retaining the predevelopment hydrologic and water quality characteristics. This area shall be a minimum contiguous area of 10,000 square feet.
New development means a land development activity, structural development (construction, installation or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site.
Nonpoint-source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint-source pollution is a byproduct of land-use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
Off-site system means a stormwater management system located outside the boundaries of the site.
Overbank and extreme flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e., flow events that exceed the capacity of the channel and enter the floodplain).
Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit means the permit issued by the county environmental management department to the applicant, which is required for undertaking any land development activity.
Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Post-construction means the conditions anticipated to exist on-site immediately after completion of the proposed development.
Post-development means the conditions anticipated to exist on site immediately after completion of the proposed development.
Practicability policy means the latest edition of the Metropolitan North Georgia Water Planning District's Policy on Practicability Analysis for Runoff Reduction.
Pre-development means the conditions that exist on a site immediately before implementation of the proposed development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish predevelopment conditions.
Pre-development hydrology means (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property.
Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpointsource pollution.
Routine maintenance means activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.
Runoff means stormwater runoff.
Regional stormwater management facility/regional facility means any stormwater management system designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.
Site means the parcel of land being developed, or the portion thereof on which the land development project is located.
Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and, reducing impervious cover and using natural features for stormwater management.
Stormwater drainage system means a system designed to provide adequate surface drainage that includes inlets, street and roadway gutters, ditches, small channels, swales and underground piping systems.
Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public's health, safety and general welfare.
Stormwater management facility means an engineered facility designed to reduce and/or treat stormwater runoff, which mitigate the effects of increased stormwater runoff peak rate, volume, and velocity.
Stormwater management plan means a plan for post-construction stormwater management at the site that meets the requirements of section 104-561 and is included as part of the land development application. Stormwater management standards means those standards set forth in section 104-559.
Stormwater management system means the entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater nonstructural practice means a nonstructural component of the stormwater management system that provides enhanced stormwater quantity and/or quality control or other benefits, including, but is not limited to, riparian buffers, natural conservation areas, overland flow filtration areas, natural depressions, and vegetated channels.
Stormwater runoff means the flow of surface water resulting from precipitation.
Stormwater structural control means an engineered stormwater management device that controls and mitigates the effects of increased stormwater runoff.
Subbasin means the hydrologic divisions of a watershed that are relatively homogeneous
Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
Historia
(Ord. No. 2020-09, § 1, 12-10-2020)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.