Fayette County · Ordenanza de zonificación
Part II - COUNTY CODE / Part B - LAND DEVELOPMENT AND LAND USE / Chapter 104 - DEVELOPMENT REGULATIONS / Article III - STREET DESIGN STANDARDS AND SPECIFICATIONS
Sec. 104-56. Resurfacing of county roads and streets.
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The following requirements shall apply to resurfacing projects of county roads and streets by an owner as a result of a related subdivision or development project.
Unless noted otherwise, all work shall be provided by the owner at no cost to the county.
(1) All work and material shall meet minimum GDOT Standard Specifications, as available on the GDOT webpage.
(2) All weak areas, as identified by the road department, shall be removed and repaired with proper full depth patches. All debris (e.g., soil, GAB, asphalt, etc.) shall be removed and disposed of properly.
(3) The surface to be overlaid shall be thoroughly cleaned and all debris removed.
(4) A lack coat of asphalt, meeting GDOT standards, shall be applied to the entire suffice to be overlaid.
(5) Prior to placing the overlay, a county-approved leveling course shall be used where necessary or as determined by the engineering department.
(6) The county road department will evaluate the existing pavement conditions and determine the overlay thickness using the methods in the asphalt institute's manual, asphalt overlays for highway and street rehabilitation.
For all streets other than residential, actual traffic counts will be obtained and coring (by owner), or other acceptable methods of obtaining the actual existing pavement thickness, will be utilized. In no case shall an overlay thickness be less than one inch.
(7) For roads with curb and gutter, the top layers of asphalt shall be removed by milling if the top elevation of the proposed overlay will be 1.5 inches or more above the top of gutter. The county may elect to share milling costs if it is desired to remove more than the minimum thickness required for the resurfacing.
Historia
(Code 1992, § 8-54; Ord. No. 2012-06, § 1, 4-12-2012)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.