11-3. Application for building permit.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All applications for building permits, except single-family residential, duplexes, and triplexes shall be accompanied by two (2) site plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate, the setback lines of the building on the �permit lot�, the various easements on the lot and such other information as may be essential for determining whether the provisions of this ordinance are being observed. The following is required on the site plan before the site plan is considered by the zoning administrator and any permits are approved (single-family residential, duplexes and triplexes are excluded from the following items except number 3 and number 6 below):

1. Topography (MSL) existing and proposed.

2. Drainage plans.

3. Location and size of ingress/egress.

4. Water and sewer mains and services, both existing and proposed.

5. Water and sewer services as well as fire hydrants in the lot and the specific meter size and location.

6. Well and septic location, when appropriate.

Any building permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work of development is commenced; provided that extensions of time and periods not exceeding six

(6) months each may be allowed in writing by the zoning administrator. Any unapproved deviation from the site plan shall cause the zoning administrator to not issue a certificate of occupancy.

Single-family residential site plans need not be drawn to scale, but must be accurate as to dimensions of lot and proposed building.

The applicant for a building permit shall submit a certificate with his application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or is a lot which has been created through governmental taking of property.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:fitzgerald/zoning/11-3@2026-11-11-75bcd851e3