Flowery Branch · Ordenanza de zonificación
Appendix C - ZONING ORDINANCE / Article 6 - AGRICULTURAL AND CONVENTIONAL RESIDENTIAL ZONING DISTRICTS
Sec. 6.11. Permits and Certificates in PUD Legacy Districts.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No building permit or certificate of occupancy shall be issued for a building, structure, or use, nor shall any excavation, grading, or land disturbance applications be approved, for any PUD that has not been approved in accordance with the provisions of this Article. The Zoning Administrator shall authorize the issuance of building permits for buildings and structures in the area covered by the approved PUD only if they are in conformity with the approved PUD, after improvements are installed in accordance with applicable improvement requirements, and if found to be in conformance with all other applicable regulations. The Zoning Administrator shall authorize the issuance of a certificate of occupancy for any completed building, structure, or use located in the area covered by the PUD only if it conforms to the requirements of the approved PUD and all other applicable regulations. After completion of a PUD, the use of
land and construction, modification, or alteration of any buildings, structures, or uses within the area covered by the PUD shall continue to be regulated by the approved development plan, architectural elevations, conditions of zoning approval, and any other specifications for the PUD.
Historia
(Ord. No. 732, § 1(Exh. A), 3-6-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.