Forest Park · Ordenanza de zonificación
Title 8 - PLANNING AND DEVELOPMENT / Chapter 8 - ZONING / Article E - TREE PROTECTION
Sec. 8-8-134. Land vegetation permit required.
Sobre este texto
- As published by Municode, current through 2026-10-21
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Unless specifically exempted from this article, all owners, developers of land, or contractors, must secure a land and vegetation disturbance permit prior to the removal, relocation, or transportation of any trees in the incorporated city limits of Forest Park.
(1) Procedure. Four (4) copies of a tree protection plan (TPP) must be submitted to the planning and community development director, or his/her designee, for review to ascertain conformance to the City of Forest Park Tree Protection Ordinance prior to application for a land and vegetation disturbance permit and/or application for development plan and preliminary plat approval. It is advised that a qualified landscape architect, Georgia Forestry Commission (GFC) certified urban forester, or arborist prepare the TPP.
The TPP must include:
a. The exact location of all existing trees and specimen trees more than ten (10) inches in diameter clearly indicating those which will be retained to meet the tree protection requirements, their size, dripline area and species.
b. The location, size, and species of all replacement trees.
c. The boundaries of all required buffer areas.
d. The boundaries of all existing and proposed landscaped areas.
e. The boundaries of all existing and proposed buildings.
f. The boundaries of all vehicle and pedestrian use areas.
g. All existing and proposed utilities (i.e., water, sewer, stormwater drainage and retention facilities, etc.), and all existing and proposed utility poles and/or light poles.
Upon submission of the TPP, the planning, building, and zoning director, or his/her designee, shall:
a. Conduct a preliminary review of the TPP.
b. Conduct an on-site inspection to determine if there are any trees of exceptional aesthetic or historical value.
c. Return the TPP either approved or with changes which must be made prior to the issuance of a land and vegetation disturbance permit.
After final approval of the TPP by the planning and community development director, or his/her designee, development plan and plats can be forwarded for review, of the land and vegetation disturbance permit can be issued.
(2) Compliance. It is the responsibility of the planning and community development director, or his/her designee, to review the TPP to ascertain compliance with the provisions of the tree protection ordinance before a land and vegetation disturbance permit will be issued. It is also the responsibility of the planning and community development director, or his/her designee, to conduct a final inspection for compliance with the tree protection ordinance before a certificate of occupancy or acceptance of streets will be granted.
(3) Appeal procedure. Any applicant for a land and vegetation disturbance permit who is aggrieved by any decision of the planning and community development director, or his/her designee, relating to the application of this article shall have the right to appeal to the city manager. Such appeal shall be requested in writing no less than ten (10) days after the decision has been made. The appeal shall be heard by the city manager within thirty (30) days after the receipt of the appeals request. The city manager shall have the right to overturn, modify, or affirm the decision made by the planning and community development director, or his/her designee.
Historia
(Ord. No. 22-14, § 2(Exh. B), 9-6-2022)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.