Sec. 8-8-215. Review process and standards.

Sobre este texto

  • As published by Municode, current through 2026-10-21
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Land development site plans shall be subject to the following review and approval process:

(1 ) General requirements. All applications may be obtained through the planning and community development department. Fees shall be paid at the time the petition and permit applications are submitted.

a. All applications shall be made on forms provided by the director.

b. All petitioners and permit applicants shall submit original applications which are completed in their entirety either in ink or typed. All applications shall be signed and notarized (if required).

c. All petitioners and applicants shall submit copies of applications and necessary attachments as required by the director.

(2) Application. The petitioner shall submit an application for land development site plans review, an affidavit and consent of property owner (if the property owner is someone other than the petitioner), a deed for the property involved, the required filing fee, and required supportive information to the city planner. Supportive information shall include, but not be limited to the following:

a. A location map showing and clearly identifying the subject property and showing all land within one (1) mile of the subject property.

b. A property survey showing all existing structures, topography, trees with a diameter measured at chest height of eight (8) inches or greater, floodplain and floodway boundaries (including elevations), rights-of-way, easements, building setback lines, drainage areas, pipes, known tiles, structures, utility services, historic structures, and road accesses.

c. A site plan, drawn to scale and bearing the seal of a professional engineer or land surveyor clearly showing all aspects of the property and all features relevant to the site development plan, including:

1. All proposed setbacks, buffer yards, structure heights, and lot coverage calculations;

2. All proposed buildings, structures, fences or walls, areas of outdoor storage, permanent dumpsters, and other improvements;

3. All proposed locations and dimensions of road accesses, interior drives, parking lots, loading docks or areas, sight visibility triangles, and interior sidewalks (all public road access shall be subject to the approval of the "name of jurisdiction" board of commissioners);

4. All proposed open spaces;

5. All proposed locations and capacities of public and private utilities (all septic systems shall be subject to the approval of the health department, all public sewer connections shall be subject to the approval of the appropriate public service provider);

6. All proposed public improvements including sidewalks, street trees, and right-of-way dedications; and

7. All proposed locations for temporary uses, such as seasonal sales areas.

d. A landscaping plan, drawn to scale and bearing the seal of a registered landscape architect, architect, engineer, or surveyor showing all required and proposed landscaping in the site interior, in and adjacent to parking areas, in buffer yards, and street trees. The landscaping plan shall include the identification of the height of the plantings from ground level at the time of installation and the species proposed to be used to meet the requirements of this Code.

e. A site drainage plan bearing the seal of a professional architect engineer or land surveyor including all calculations required by the city engineer. All land development site plans shall be subject to the approval of the city engineer.

f. A site construction plan showing proposed erosion control measures, the location of any proposed construction trailer and worker parking, the location, height, and dimensions of any temporary construction-related signage, any temporary site accesses to be used during construction, any temporary utility connections, the location of any stockpiles of dirt, construction materials, and construction waste dumpsters or storage areas.

g. A detailed statement of the characteristics and operation of the development, including the population densities, presence of any adult uses, and number of potential employees. The detail statement shall include any written commitments being made regarding the land development site plans.

h . Data required for site plan shall include:

1. Activity schedule showing anticipated starting and completion dates for the project. Include the statement in bold letters, that "the installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land-disturbing activities".

2. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas.

3. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for year-round seeding.

4. Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia, Chapter 6.

1. Maps, drawings, and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. The certified plans shall contain:

1. Graphic scale and north point or arrow indicating magnetic north.

2. Vicinity maps showing location of project and existing streets.

3. Boundary line survey.

4. Delineation of disturbed areas within project boundary. Existing and planned contours, at two (2) foot intervals.

5. Adjacent areas and features areas such as streams, lakes, residential areas, etc. which might be affected should be indicated on the plan.

6. Proposed structures or additions to existing structures and paved areas.

7. Delineate the twenty-five (25) foot horizontal buffer adjacent to state waters and the specified width in MRPA area.

8. Delineate the specified horizontal buffer along designated trout streams, where applicable.

9. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, Chapter 6.

(3) Review process. The application shall be approved by the following divisions:

Planning and community development department, the public works department, the fire marshal, and the Clayton County Water Authority. Once approval is granted the director shall issue the land disturbance permit and NPDES permit.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 21-11, § l(Exh. A), 9-7-2021)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:forest-park/zoning/8-8-215@2026-10-21-30435d9421

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Forest Park Zoning Ordinance, Sec. 8-8-215. Review process and standards | Georgia Commons