Fort Oglethorpe · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 4 - LOT AND BUILDING STANDARDS / Article 4 - LANDSCAPING REQUIREMENTS
Sec. 4.11. Certificate of occupancy/bonding.
Sobre este texto
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) If the landscaping has not been installed and inspected for proper installation prior to receiving a certificate of occupancy, a certificate of occupancy may be granted provided the following conditions are met.
(1) Property owner posts a performance bond or irrevocable letter of credit or a certified check or cash with the city finance director;
(2) The amount of the surety shall be based on material and installation costs of the uninstalled landscape material, including a 20 percent contingency cost, as shown on the submitted landscape plan; and
(3) The costs of the landscaping shall be certified by a landscape architect licensed in the State of Georgia.
(b) After receiving the certificate of occupancy, the remaining landscape material shall be installed within three months. The bond or letter of credit shall be called if the required landscaping has not been installed by the end of the three-month period and the funds applied to complete the landscaping work.
Historia
(Ord. No. 2021-10, § 1, 6-28-2021)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.