Fort Oglethorpe · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 3 - STREET DESIGN STANDARDS
Sec. 3.7. Temporary turn-arounds.
Sobre este texto
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Stub-out streets shall not be allowed, except at unit lines. A temporary turn-around is required when the street length exceeds the minimum width of one lot permitted under the applicable zoning district.
(b) A temporary turn-around shall be maintained for a period not to exceed 24 months.
All such turn-arounds shall, at a minimum, be constructed with six inches of graded aggregate base, and have a minimum driving radius of 30 feet.
(c) Where temporary turn-arounds are permitted, the director of public works may require a performance guarantee for completion of a cul-de-sac. The director of building, planning and zoning or director of public works may also require that the final plat record sufficient right-of-way to construct a permanent cul-de-sac. Such right-of-way will revert to typical street right-of-way when the street is extended.
Historia
(Ord. No. 2021-10, § 1, 6-28-2021)