Fort Oglethorpe · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 4 - STREET CONSTRUCTION STANDARDS
Sec. 4.9. Tack coat.
Sobre este texto
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) A tack coat shall be applied over the binder before placing the surface asphalt.
(b) The tack coat shall comply with section 413 of the Georgia Department of Transportation "Standard Specifications Construction of Transportation Systems" (latest edition), and applied at a rate of 0.05 gallons per square yard of residual bituminous material.
(c) Other tack materials may be used or the tack coat may be eliminated, if approved by the geotechnical engineer and the director of public works.
Historia
(Ord. No. 2021-10, § 1, 6-28-2021)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.