Garden City · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 90 - ZONING / Article VII - ADMINISTRATION / Division 1 - GENERALLY
Sec. 90-197. Building permit.
Sobre este texto
- As published by Municode, current through 2026-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Required; application. A building permit issued by the building official is required in advance of the initiation of construction, erection, moving or alteration of any building or structure. All applications for building permits shall be accompanied by a plat or plan in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the size of the building to be erected, the location of the building on the lot, the number of dwelling units the building is designed to accommodate, and such other information as may be essential for determining whether the provisions of this chapter are being observed. A record of all applications for building permits and plats or plans shall be kept by the building official.
(b) Approval of wells and septic tanks by county health department. When a proposed development is to be served by wells or by septic tanks, then the applicant for a permit for such development shall submit with his application a certificate from the county health department approving the well or septic tank.
(c) Issuance. If the building official is satisfied that the work described in the application for the permit and the drawing filed therewith conform to the requirements of this chapter, and if proper certifications have been obtained from the county health department approving the proposed development, then the building official shall issue a building permit for such development to the applicant, along with a signed copy of the plat or plan.
(d) Denial. If the application for a permit and the plat or plan filed therewith describes work which does not conform to the requirements of this chapter, or if the health department recommends that a permit be denied for reason of public health, then the building official shall not issue a permit. In such a case, the building official shall return the plat or plan to the applicant showing his refusal to issue such a permit. Such refusal shall state the reason why the permit was denied and shall cite the particular sections and articles of this chapter with which the application does not comply.
(e) Expiration. Any building permit which is issued shall become invalid unless the work authorized by it shall have commenced within six months of its issuance, or if the work or development authorized by such permit is suspended or abandoned for a period of six months after the work or development is commenced; provided that extension of time for periods not exceeding six months each may be allowed in writing by the building official.
Historia
(Code 1976, § 8-3026(b)—(f))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.