Gordon County · Ordenanza de zonificación
Chapter 3 - PROTECTION OF NATURAL FEATURES AND RESOURCES
3.02.06. Land Use Restrictions
Sobre este texto
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Within the water supply watershed district, the following limitations on permissible uses shall apply to all water quality critical areas:
1. Industries. No industries or businesses that distribute or warehouse hazardous materials may be located within the water quality critical area.
2. Commercial and service establishments. Uses that provide for the sale of fuel for motor vehicles are prohibited within the water quality critical area.
3. Residential land use. There are no additional restrictions on the types of residential land use allowed within the water quality critical area.
4. Agricultural land use. Uses that are not in conformance with the best management practices (BMPs) of the Georgia Department of Agriculture and USDA are prohibited.
5. Landfills and waste disposal. No landfills or wastewater disposal facilities of any kind (except for septic tanks approved by the Board of Health) shall be allowed within the water quality critical area.
6. Hazardous and toxic materials. No underground fuel or chemical storage tanks shall be allowed in the water quality critical area. No facilities that dispose of toxic or hazardous waste may be located within the water quality critical area. No industries or businesses classified as large quantity generators of hazardous waste may be located within the water quality critical area.
7. Fuel and chemical storage tanks. Underground fuel or chemical storage tanks within the water supply watershed district shall meet all applicable requirements set by the Georgia Department of Natural Resources, Environmental Protection Division.
B. Impervious surface setbacks
1. For all perennial streams within a seven-mile radius of water supply intake, no impervious surface shall be constructed within a one hundred fifty (150) feet setback area on both sides of the stream as measured from the stream banks.
2. For all perennial streams beyond a seven-mile radius of the water supply intake, no impervious surface shall be constructed within a seventy-five (75) feet setback area on both sides of the stream as measured from the stream banks.
C. Vegetative buffers
1. Stream buffers within water quality critical area. For all perennial streams within a seven-mile radius of a water supply intake, a vegetative buffer shall be maintained for a distance of fifty (50) feet on both sides of the stream as measured from the stream banks.
2. Stream buffers outside the water quality critical area. For all perennial streams beyond a seven-mile radius of a water supply intake, a buffer shall be maintained for a distance of twenty-five (25) feet on both sides of the stream as measured from the stream banks.
3. Silvicultural BMPs. Notwithstanding any other provisions of this section, forestry practices, in accordance with a forest management plan that incorporates best management practices (BMPs) approved by the Georgia Forestry Commission, shall be permissible in the buffer areas.
4. Agricultural BMPs. Notwithstanding any other provisions of this section, the continued cultivation of agricultural crops and the pasturing of livestock shall be permissible within the buffer area, provided that the best management practices of the Georgia Department of Agriculture are followed.
D. Septic tank drainfield restrictions. Septic tanks and septic tank drainfields are prohibited in the setback area established in subsections (B)(1) and (B)(2) above.
E. Street runoff and drainage
1. New streets constructed within the water quality critical area shall not require any curb and gutter improvements additional to those required in this ULDC.
2. New streets that cross perennial streams within a seven-mile radius upstream of the water supply intake shall be designed in such a way as to avoid direct runoff from the paved surface into the streams they cross.
3. Such design features shall be shown on the site plan.
F. Hazardous materials handling
1. New facilities located within the water supply watershed district that handle hazardous materials of a type and amounts requiring a permit from the department of natural resources or that require disposal at a hazardous materials facility by a hazardous materials handler permitted or licensed by the department of natural resources, shall perform their operations on impermeable surfaces having spill and leak collection systems.
2. Such spill and leak collection systems shall be shown on the site plan in detail and must be approved, as part of the site plan, by the Director of Planning and Development.
G. Soil erosion and sedimentation control. All developments and land-disturbing activity within the water supply watershed district shall comply fully with Section 3.06.00 of this ULDC.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.